Changes

Jump to navigation Jump to search
m
Line 33: Line 33:
*''d'' = Depth of infiltration practice in m.}}
*''d'' = Depth of infiltration practice in m.}}


==Step 2==
==Step 2, geometry and perimeter==
[[file:Hydraulic radius.png|thumb|Two practice areas of 9 m<sup>2</sup>.<br>
[[file:Hydraulic radius.png|thumb|Two practice areas of 9 m<sup>2</sup>.<br>
P = 12 m (left), P = 20 m (right)]]
P = 12 m (left), P = 20 m (right)]]
Line 41: Line 41:
Divide the area of the practice (''A<sub>p</sub>'') by the perimeter (''P'').
Divide the area of the practice (''A<sub>p</sub>'') by the perimeter (''P'').
</poem>
</poem>
==Step 3==
==Step 3==
[[File:Sizing bio2.png|thumb|The duration of surface ponding is usually determined by the emptying of the facility below.]]  
[[File:Sizing bio2.png|thumb|The duration of surface ponding is usually determined by the emptying of the facility below.]]  

Navigation menu