Systems cannot be located on natural slopes greater than 15 %. The gravel bed should be designed with gentle slopes between 0.5 - 1 %. | Systems cannot be located on natural slopes greater than 15 %. The gravel bed should be designed with gentle slopes between 0.5 - 1 %. |