| ==Places of worship== | | ==Places of worship== |
| [[File:Landforms of a place of worship.JPG|thumb|Source areas within a typical place of worship]] | | [[File:Landforms of a place of worship.JPG|thumb|Source areas within a typical place of worship]] |
| | |
| | Each distinct area of your site can be a source for runoff |
| | (referred to as a ‘source area’). One or more of these areas |
| | should be targeted when introducing LID at your place of |
| | worship. |
| | ===Targeting hard surfaces=== |
| | Hard surfaces such as parking lots are a great opportunity to |
| | implement LID. Parking lots are the main source of runoff and |
| | represent the most significant source of stormwater pollutants |
| | coming from your site. |
| | Parking lots at places of worship are typically busy only on |
| | select days of the week when groups gather for prayer or |
| | other community activities. Due to this intermittent schedule, |
| | parking lots at these facilities are often rented for other |
| | purposes during times of low usage. On sites where peak |
| | demand does not approach the total capacity of the lot, |
| | consider reducing the parking surface. |
| | Retrofit options for these large parking lot areas include |
| | permeable pavement, bioswales and bioretention areas. |
| | A benefit of permeable pavement systems is that they often |
| | have a longer lifespan than conventional infrastructure. |
| | The freeze-thaw cycle of the Ontario climate is tough on |
| | pavement. Frost heaving and slumping can cause cracks and |
| | potholes because of the expansion and contraction of water. |
| | The expected lifespan for conventional asphalt pavement |
| | in a northern climate, such as Ontario, is approximately 15 to |
| | 20 years. A well-maintained porous asphalt system can last for |
| | over 30 years, and permeable interlocking concrete pavers |
| | can have a design life of 20 to 25 years or greater. |
| | Using LID techniques to manage stormwater can also |
| | eliminate or reduce the need for an on-site storm sewer |
| | system. By eliminating piping, failure points in the pavement, |
| | such as areas around catch basins and manholes, can be |
| | eliminated. A design that does not use storm sewers also |
| | negates the need to replace on-site piping, thereby saving |
| | long-term infrastructure replacement costs. |
| | Prefabricated modular infiltration chambers are gaining |
| | acceptance because they are easy to integrate with parking |
| | lot functions. These subsurface systems are typically installed |
| | over a coarse granular reservoir to provide water storage and |
| | allow infiltration into native soils. Infiltration chambers under |
| | conventional asphalt systems work well on sites where parking |
| | demand does not allow space for a stormwater feature. |
| | |
| | ===Landscaped areas=== |
| | |
| | Landscaped or lawn areas adjacent to the parking lot or |
| | building present opportunities for implementation of LID |
| | practices such as bioswales and bioretention areas. These |
| | areas typically accept runoff from nearby hard surfaces and |
| | provide water quality and water balance benefits. |
| | |
| | ===Roof options=== |
| | |
| | Rainwater harvesting systems can be simple or complex |
| | depending on the architecture and roof drainage patterns of |
| | your building. Many places of worship have peaked roofs with |
| | piping to convey water from the rooftop. If your site is set up |
| | this way, it can be easy to integrate harvesting systems into |
| | the landscape surrounding your building. |
| | Roof runoff can also be directed to soakaways located on |
| | passive use areas around your building. Due to the relatively |
| | good quality of this runoff, pre-treatment devices are not |
| | required. |
| | |
| | ===Source Areas=== |
| | The LID option that best fits your site will depend what types |
| | of source areas are present. Types of source areas include: |
| | * Active use area |
| | * Passive use area |
| | * Pedestrian walkway |
| | * Internal driveway |
| | * Parking lot |
| | |
| | On park sites, pollution prevention is often associated with |
| | changes to operations and maintenance practices and has |
| | not been included in Table 6.3.1. An aerial photo of a park |
| | with each of these source areas accompanies Table 6.3.1. |
| | Options and implementation strategies for a few of these |
| | source areas will give you some ideas for your park site. |
| | |
| | The scale |
| | of your LID retrofit project will largely determine how you will |
| | proceed. You can usually complete |
| | small-scale LID projects with in-house expertise and |
| | resources. Large-scale projects will require external support |
| | from consultants and contractors. |
| | |
| | ===Small-scale projects=== |
| | |
| | Starting with small-scale projects is a good strategy to |
| | increase interest within your community, determine if |
| | support is available from stakeholder groups and gain retrofit |
| | experience. Small-scale projects include retrofitting your |
| | property with landscape alternatives, rain barrels or using |
| | pollution prevention strategies and practices. |
| | |
| | Small-scale projects require few resources and a |
| | small project budget because: |
| | * They do not require integration into capital works projects |
| | * Engineering consultants are not required |
| | * Contractors are not required |
| | * External approvals are not required |
| | * Consultation with the public is limited |
| | Due to the less significant financial commitment, it can be |
| | easier to build the case for support for small-scale projects. |
| | A successful small-scale LID retrofit project on your property |
| | is a good indication that you are ready to take on a more |
| | intensive retrofit project. You now know the resources that Large-scale projects |
| | Large-scale projects require significantly more effort, budget, |
| | and staff than small-scale projects. Large-scale LID retrofits |
| | include: |
| | * Bioretention |
| | * Enhanced grass swales |
| | * Bioswales |
| | * Perforated pipe systems |
| | * Permeable pavement |
| | * Soakaways |
| | * Infiltration chambers |
| | * Rainwater harvesting (excluding rain barrels) |
| | * Prefabricated modules |
| | * Green roofs |
| | |
| | Consider a large-scale project if your place of worship is |
| | striving to be a community leader in sustainability. Large-scale |
| | projects are often highly visible and attract more public |
| | attention. They may also be the only solution |
| | to site-specific challenges, like poor drainage. Before starting |
| | a large-scale retrofit project consider the distinctions that set |
| | these retrofits apart from small-scale projects. |
| | |
| | ===Integration with long-term infrastructure replacement and rehabilitation plans=== |
| | |
| | Most large-scale LID retrofits must function with existing |
| | site infrastructure, such as storm sewers, catch basins, |
| | and pavement systems. The construction of large-scale |
| | LID practices often requires these systems to be removed, |
| | exposed, or replaced. The best time for this type of project is when an infrastructure replacement or rehabilitation |
| | project is already planned. |
| | Maintenance programs and budgets that take into consideration |
| | the expected life cycle of critical site components, including |
| | parking lot and roofs, are valuable resources for large-scale |
| | projects. If the replacement of these features is forecasted in |
| | your site budget well in advance, asses if it is advantageous |
| | to incorporate LID retrofits into these projects. Remember, |
| | sharing construction materials, construction equipment, staff |
| | resources, and time will reduce the budget for your retrofit. |
| | For example, installing bioretention, infiltration chambers, |
| | or permeable pavement in a parking lot will require the |
| | existing pavement to be removed. Budget and resources that |
| | have been set aside for a parking lot replacement could be |
| | transferred to the LID retrofit project. |
| | |
| | ===Involvement of consultants and contractors=== |
| | |
| | Consultants are required for large-scale retrofit projects, |
| | specifically for the final screening of options, pre-design, |
| | detailed design, tender and contract documents, construction |
| | supervision and administration, and assumption and |
| | verification. |
| | |
| | Site contractors are also required for large-scale LID retrofits. |
| | Contractors should be pre-qualified based on previous |
| | experience with similar LID projects. |
| | |
| | External approvals |
| | Large-scale retrofits may require a variety of approvals at the |
| | municipal, watershed, provincial, and/or federal level. |
| | Since LID is still relatively new, you may encounter policies |
| | or bylaws that present barriers to LID retrofit projects. |
| | Alternatively, the municipality may have to amend or enforce |
| | some policies and bylaws to facilitate the implementation of |
| | LID projects on your site. |
|
| |
|
| {| class="wikitable sortable" style="text-align: center;" | | {| class="wikitable sortable" style="text-align: center;" |
Line 403: |
Line 576: |
| |style="text-align: left;" |Building || * || * || * || ** || ** || * || ** || o || o || * | | |style="text-align: left;" |Building || * || * || * || ** || ** || * || ** || o || o || * |
| |} | | |} |
| | |
| | ===stuff to maybe integrate into the above=== |
| | |
| | '''Figure 6.3.1: When considering any parking lot retrofit, first determine if the parking spaces provided are consistent with the''' |
| | demand. In place of worship, the demand will fluctuate. (Source: CVC) |
| | |
| | '''Did you know that green roofs can help''' |
| | reduce your heating and cooling costs? |
| | These systems absorb heat and act as |
| | insulators for buildings. It has been estimated |
| | that a 3,000 m2 green roof on a one story |
| | building in Toronto could reduce the cost of |
| | cooling a building in the summer by 6% and |
| | the cost of heating a building by 10% in the |
| | winter23. |
| | |