Changes

Jump to navigation Jump to search
m
Line 82: Line 82:

Large-scale projects require significantly more effort, budget, and staff than small-scale projects. Large-scale LID practices include:
Large-scale projects require significantly more effort, budget, and staff than small-scale projects. Large-scale LID practices include:
* Bioretention
* [[Bioretention]]
* Enhanced grass swales
* [[Enhanced grass swales]]
* Bioswales
* [[Bioswales]]
* Perforated pipe systems
* Perforated pipe systems
* Permeable pavement
* [[Permeable paving|Permeable pavement]]
* Soakaways
* [[Soakaways, Infiltration Trenches and Infiltration Chambers Guide|Soakaways]]
* Infiltration chambers
* [[Infiltration chambers]]
* Rainwater harvesting  
* [[Rainwater harvesting]]
* Prefabricated modules
* Prefabricated modules


722

edits

Navigation menu