Changes

Jump to navigation Jump to search
m
Line 3: Line 3:
*Infiltration facilities can be designed to be inline or offline from the drainage system. See [[Inlets]]
*Infiltration facilities can be designed to be inline or offline from the drainage system. See [[Inlets]]
*Inline facilities accept all of the flow from a drainage area and convey larger event flows through an overflow outlet. The overflow must be sized to safely convey larger storm events out of the facility.  
*Inline facilities accept all of the flow from a drainage area and convey larger event flows through an overflow outlet. The overflow must be sized to safely convey larger storm events out of the facility.  
:
   
   
*The overflow must be situated at the far end of the facility to prevent any localised ponding to cause bypassing of the infiltration facility.  
*The overflow must be situated at the far end of the facility to prevent any localised ponding to cause bypassing of the infiltration facility.  

Navigation menu