Line 53: Line 53:
! 3
! 3
|-
|-
|Catchment < 100 m²<ref>Ballard, B. W., Wilson, S., Udale-Clarke, H., Illman, S., Scott, T., Ashley, R., & Kellagher, R. (2015). The SuDS Manual. London.</ref>
|Catchment < 100 m²
|Catchment > 100 m²
|Catchment > 100 m²<ref>Ballard, B. W., Wilson, S., Udale-Clarke, H., Illman, S., Scott, T., Ashley, R., & Kellagher, R. (2015). The SuDS Manual. London.</ref>
|-
|-
|
|Permeameter or Percolation test on site
|Double ring infiltrometer test on site, or Grain size used <ref>San Francisco Public Utilities Commission. (2017). Determination of Design Infiltration Rates for the Sizing of Infiltration‐based Green Infrastructure Facilities. Retrieved from http://sfwater.org/modules/showdocument.aspx?documentid=9681</ref> 
|}
----