Line 44: |
Line 44: |
| ===Background Evaluation=== | | ===Background Evaluation=== |
| Prior to performing testing and developing a detailed site plan, existing site conditions should be inventoried and mapped including, but not limited to: | | Prior to performing testing and developing a detailed site plan, existing site conditions should be inventoried and mapped including, but not limited to: |
| | | #Surficial geology and underlying stratigraphy; |
| *Surficial geology and underlying stratigraphy;
| | #Watercourses (perennial and intermittent), water bodies, wetlands and floodplains; |
| *Watercourses (perennial and intermittent), water bodies, wetlands and floodplains;
| | #Small headwater drainage features; |
| *Small headwater drainage features;
| | #Topography, slope, and drainage patterns; |
| *Topography, slope, and drainage patterns;
| | #Existing land cover and land use; |
| *Existing land cover and land use;
| | #Natural heritage conservation areas; and |
| *Natural heritage conservation areas; and
| | #Other man-made features or conditions that may impact design such as existing nearby structures (buildings, infrastructure, etc.). |
| *Other man-made features or conditions that may impact design such as existing nearby structures (buildings, infrastructure, etc.).
| |
|
| |
|
| A sketch plan or preliminary layout plan for the proposed development should be evaluated, including: | | A sketch plan or preliminary layout plan for the proposed development should be evaluated, including: |
| | #The preliminary grading plan and areas of cut and fill; |
| | #The location and water surface elevation of all existing, and location of proposed water supply sources and wells; |
| | #The location of all existing and proposed on-site wastewater (septic) systems; |
| | #The location of other features of note such as utility rights-of-way, water and sewer lines, etc.; |
| | #Existing data from borehole, well and geophysical testing; and |
| | #Proposed location of development features (buildings, roads, utilities, etc.). |
|
| |
|
| *The preliminary grading plan and areas of cut and fill;
| |
| *The location and water surface elevation of all existing, and location of proposed water supply sources and wells;
| |
| *The location of all existing and proposed on-site wastewater (septic) systems;
| |
| *The location of other features of note such as utility rights-of-way, water and sewer lines, etc.;
| |
| *Existing data from borehole, well and geophysical testing; and
| |
| *Proposed location of development features (buildings, roads, utilities, etc.).
| |
| ===Sampling=== | | ===Sampling=== |
| The number of test pits or soil borings varies depending on site conditions and the proposed development plan. General guidelines are as follows: | | The number of test pits or soil borings varies depending on site conditions and the proposed development plan. General guidelines are as follows: |