Changes

Jump to navigation Jump to search
m
Line 60: Line 60:
The bottom of the reservoir should be level so that water infiltrates evenly. If the system is not designed for infiltration, the bottom should slope at 1 - 5% toward the underdrain.  
The bottom of the reservoir should be level so that water infiltrates evenly. If the system is not designed for infiltration, the bottom should slope at 1 - 5% toward the underdrain.  


'''[[Permeable paving: Sizing and modeling]]'''
'''[[Permeable paving: Sizing]]'''


==Gallery==
==Gallery==

Navigation menu