Changes

Jump to navigation Jump to search
200 bytes removed ,  6 years ago
m
Line 62: Line 62:
==Design==
==Design==
{| class="wikitable"
{| class="wikitable"
|+Design parameters for free-water surface flow wetlands <ref>Toronto and Region Conservation Authority (TRCA), and CH2M Hill Canada. 2018. Inspection and Maintenance Guide for Stormwater Management Ponds and Constructed Wetlands (T van Seters, L Rocha, and K Delidjakovva, Eds.).</ref>
|+Design parameters for free-water surface flow wetlands <refname="TRCA">Toronto and Region Conservation Authority (TRCA), and CH2M Hill Canada. 2018. Inspection and Maintenance Guide for Stormwater Management Ponds and Constructed Wetlands (T van Seters, L Rocha, and K Delidjakovva, Eds.).</ref>
!Element  
!Element  
!Design Objective  
!Design Objective  
Line 134: Line 134:
===.===
===.===
{| class="wikitable"
{| class="wikitable"
|+Water volume storage requirements based on catchment type and receiving waters<ref>Toronto and Region Conservation Authority (TRCA), and CH2M Hill Canada. 2018. Inspection and Maintenance Guide for Stormwater Management Ponds and Constructed Wetlands (T van Seters, L Rocha, and K Delidjakovva, Eds.).</ref>
|+Water volume storage requirements based on catchment type and receiving waters<refname ="TRCA"/>
!rowspan=2|Performance level
!rowspan=2|Performance level
!colspan=4|Storage volume (m<sup>3</sup>/Ha) required according to catchment impervious cover  
!colspan=4|Storage volume (m<sup>3</sup>/Ha) required according to catchment impervious cover  

Navigation menu