==Construction Tasks Table==
==Construction Tasks Table==


==Construction Tasks Described==
==Construction Tasks Described==
'''Verification of Siting and LID Design'''<br>
'''Installation of ESC and Construction Fencing'''<br>
'''ESC Inspection and Maintenance (ongoing)'''<br>
'''Clearing and Grubbing'''<br>
'''Excavation'''<br>
'''Rough Grade'''<br>
'''Verification of Grading/Survey*'''<br>
'''Scarification'''<br>               
'''Geotextile'''<br>                                                           
'''Impermeable liner'''<br>                               
'''Underdrain'''<br>
'''Overflow or Overflow Drain'''<br>                                     
'''Monitoring well'''<br>                               
'''Storage Reservoir'''<br>
'''Stone Choker  Layer'''<br>                     
'''Curbing'''<br>                                                 
'''Pre-treatment and Inlet'''<br>                 
'''Soil Media / Filter Media'''<br>
'''Finish Grading'''<br>
'''Riprap (Large Stone)'''<br>                       
'''Plant Material Verification and Installation'''<br>
'''Mulch Placement'''<br>                                                               
'''Stabilizing Contributing Drainage Area  - Planting Adjacent Vegetation'''<br>
'''As-built Survey'''<br>
'''Permanent Fencing'''<br>                                         
'''Identify and Address Deficiencies'''<br>
'''Assumption/Certification'''<br>


==Key Construction Inspection Points==
==Key Construction Inspection Points==


==Inspection Point Timeline==
==Inspection Point Timeline==


==Construction Mistakes to Avoid==
==Construction Mistakes to Avoid==
<pdf width="500" height="500”>File:CVC-LID-Construction-Guide-Book-92.pdf</pdf> <pdf width="500" height="500”>File:CVC-LID-Construction-Guide-Book-93.pdf</pdf> <pdf width="500" height="500”>File:CVC-LID-Construction-Guide-Book-94.pdf</pdf> <pdf width="500" height="500”>File:CVC-LID-Construction-Guide-Book-95.pdf</pdf>
Click below to review the following common construction-based mistakes to avoid:
<pdf width="500" height="700">File:Avoiding Common Mistakes CVC LID Construction Guide Book.indb.pdf</pdf>


==Construction Certifications Protocols==
==Construction Certifications Protocols==

Latest revision as of 19:28, 19 April 2022

This section is also applicable to: Swales Enhanced swales

Construction Tasks Table[edit]

Construction Tasks Described[edit]

Verification of Siting and LID Design
Installation of ESC and Construction Fencing
ESC Inspection and Maintenance (ongoing)
Clearing and Grubbing
Excavation
Rough Grade
Verification of Grading/Survey*
Scarification
Geotextile
Impermeable liner
Underdrain
Overflow or Overflow Drain
Monitoring well
Storage Reservoir
Stone Choker Layer
Curbing
Pre-treatment and Inlet
Soil Media / Filter Media
Finish Grading
Riprap (Large Stone)
Plant Material Verification and Installation
Mulch Placement
Stabilizing Contributing Drainage Area - Planting Adjacent Vegetation
As-built Survey
Permanent Fencing
Identify and Address Deficiencies
Assumption/Certification

Key Construction Inspection Points[edit]

Inspection Point Timeline[edit]

Construction Mistakes to Avoid[edit]

Construction Certifications Protocols[edit]