==Inspection and Testing Framework==
==Inspection and Testing Framework==


[[File:Visual indicator bioretention.PNG|thumb|300px|Example of a visual indicator to be used when assessing the condition of a given LID feature. Here we see excessive sediment accumulation at the [[inlet]]/[[curb cut]] of a bioretention cell. Source: (TRCA, 2016).<ref>STEP. 2016. Low Impact Development Stormwater Management Practice Inspection and Maintenance Guide. https://sustainabletechnologies.ca/app/uploads/2016/08/LID-IM-Guide-2016-1.pdf</ref>.]]
[[File:Storm drain protection.PNG|thumb|330px|Example of a storm drain inlet sediment control measure (sediment retention barrier) used at the bottom of an enhanced swale to limit excess suspended sediment from entering the storm drain outlet at the end of the feature. This type of barrier would generally be in place during construction activity and would be reviewed during construction inspections to ensure its operating efficiently and excess sediment is removed routinely (Source: [https://sustainabletechnologies.ca/app/uploads/2020/01/ESC-Guide-for-Urban-Construction_FINAL.pdf ESC Guide, 2019]<ref>Toronto and Region Conservation Authority (TRCA). 2019. Erosion and Sediment Control Guideline for Urban Construction. Toronto and Region Conservation Authority, Vaughan, Ontario. https://sustainabletechnologies.ca/app/uploads/2020/01/ESC-Guide-for-Urban-Construction_FINAL.pdf</ref>]]
{| class="wikitable" style="width: 900px;"
{| class="wikitable" style="width: 900px;"
|+'''Visual Indicators Framework - Enhanced Swales'''
|+'''Visual Indicators Framework - Enhanced Swales'''
Line 160: Line 160:
|}<br>
|}<br>
</br>
</br>
[[File:Soil testing indicators.PNG|thumb|300px|The image above shows a manual soil corer, a split soil core sampler kit which preserves the soil sample for further testing (i.e., bulk density) and acrylic core sample tubes. All examples of tools to be use for soil characterization testing. Source: (TRCA, 2016).<ref>STEP. 2016. Low Impact Development Stormwater Management Practice Inspection and Maintenance Guide. https://sustainabletechnologies.ca/app/uploads/2016/08/LID-IM-Guide-2016-1.pdf</ref>.]]
[[File:Simulated storm event in a swale.PNG|thumb|330px|The image above shows a simulated storm event testing indicator for an enhanced swale taking place at the [https://climate-adapt.eea.europa.eu/metadata/case-studies/climate-proofing-social-housing-landscapes-2013-groundwork-london-and-hammersmith-fulham-council Social Housing Landscapes project located in London, England]. The simulation event occurs by calculating the amount of expected rainfall to occur during a 1-in-100 year event by adding water to the feature with a large municipal watering truck during a 1-hr. event at the same expected magnitude during a natural event to ensure the LID BMP is effectively conveying an filtering stormwater in a real-life scenario (Source: Connop and Nash, 2019)<ref>Connop S. and Nash, C. 2019. A Storm in a Bioswale: Breaking Down Barriers to Nature-Based Solutions. The Nature of Cities. 16 December 2019 Accessed: 4 July 2022. https://www.thenatureofcities.com/2019/12/16/a-storm-in-a-bioswale-breaking-down-barriers-to-nature-based-solutions/</ref>]]


{| class="wikitable" style="width: 900px;"
{| class="wikitable" style="width: 900px;"

Revision as of 15:14, 4 July 2022

Inspection & Maintenance Guidance of enhanced swales, which are a vegetated stormwater best management practices that contains gently sloping open channels featuring a parabolic or trapezoidal cross-section and check dams, designed to both convey and treat stormwater runoff temporarily before entering the storm system (TRCA, 2016[1])

Overview[edit]

Enhanced swales are gently sloping vegetated open channels featuring a parabolic or trapezoidal cross-section and check dams, designed to convey and treat stormwater runoff (i.e., rainwater or snowmelt from roofs or pavements). The grading, Check dams and vegetation spreads out and slows down the flow of water, allowing suspended sediment and floatables (e.g., trash, natural debris, oil and grease) to settle out. A portion of the flowing water soaks into the soil and replenishes groundwater or is taken up by plant roots and evaporated back to the atmosphere. Runoff water is delivered to the practice through inlets such as curb cuts, spillways or other concrete structures, sheet flow from pavement edges, or pipes connected to catchbasins or roof downspouts. The planting bed and side slopes are typically covered with grasses or a mixture of flood tolerant, erosion resistant vegetation and stone. They do not feature filter media soil and sub-drains like bioretention or bioswales do. Water not ponded behind check dams or absorbed by the planting bed is conveyed to an adjacent drainage system (e.g., municipal storm sewer or other BMP) at the lowest downstream point by an outlet structure (e.g., ditch inlet catchbasin, culvert). Key components of this feature are described in further detail below.

Properly functioning enhanced swales reduce the quantity of pollutants and runoff being discharged to municipal storm sewers and receiving waters (i.e., rivers, lakes and wetlands). In addition to their SWM benefits, enhanced swales provide aesthetic value as attractive landscaped features.

Key components of Enhanced swales to pay close attention to are the:

Trash, debris and sediment builds up at these locations and can prevent water from flowing into or out of the practice.

Associated Practices[edit]

  • Grass Swales: A parabolic or trapezoidal-sized bottom, swale that contains grassed sloping sides and a filter media bottom to both convey overland flow and provide water treatment, and are often subject to more frequent maintenance. They generally contain an outlet structure at the lowest point for water to be sent to another LID BMP or the storm system; sometimes referred to as a roadside ditch. Does not contain check dams.
  • Swales: Swales are linear landscape features consisting of a drainage channel with gently sloping sides. Underground they may be filled with engineered soil and/or contain a water storage layer of coarse gravel material. Two variations on a basic swale are recommended as low impact development strategies, although using a combination of both designs may increase the benefit.
  • Bioswales are sometimes referred to as 'dry swales', 'vegetated swales', or 'water quality swales'. This type of BMP is form of bioretention with a long, linear shape (surface area typically >2:1 length:width) and a slope which conveys water and generally contains various water tolerant vegetation

Inspection and Testing Framework[edit]

Example of a storm drain inlet sediment control measure (sediment retention barrier) used at the bottom of an enhanced swale to limit excess suspended sediment from entering the storm drain outlet at the end of the feature. This type of barrier would generally be in place during construction activity and would be reviewed during construction inspections to ensure its operating efficiently and excess sediment is removed routinely (Source: ESC Guide, 2019[2]
Visual Indicators Framework - Enhanced Swales

Component

Indicators

Construction Inspection

Assumption Inspection

Routine Operation Inspection

Verification Inspection
Contributing Drainage Area
CDA condition x x x x
Inlet
Inlet/Flow Spreader Structural Integrity x x x
Inlet/Flow Spreader Structural Integrity x x x x
Pretreatment sediment accumulation x x x
Inlet erosion x x
Perimeter
BMP dimensions x x x
Side slope erosion x x
Surface ponding area x x x
Filter Bed
Standing water x x x
Trash x x
Filter bed erosion x x
Filter bed sediment accumulation x x x
Surface ponding depth x x x
Filter bed surface sinking x x x
Check dams x x x x
Planting Area
Vegetation cover x x x x
Vegetation condition x x
Vegetation composition x x x
Outlet
Overflow outlet obstruction x x x x



The image above shows a simulated storm event testing indicator for an enhanced swale taking place at the Social Housing Landscapes project located in London, England. The simulation event occurs by calculating the amount of expected rainfall to occur during a 1-in-100 year event by adding water to the feature with a large municipal watering truck during a 1-hr. event at the same expected magnitude during a natural event to ensure the LID BMP is effectively conveying an filtering stormwater in a real-life scenario (Source: Connop and Nash, 2019)[3]
Testing Indicators Framework - Enhanced Swales

Component

Indicators

Construction Inspection

Assumption Inspection

Routine Operation Inspection

Verification Inspection
Testing Indicators
Soil characterization testing x x (x)
Sediment accumulation testing x x x x
Surface infiltration rate testing x (x)
Natural or simulated storm event testing x (x)
Note: (x) denotes indicators to be used for Performance Verification inspections only (i.e., not for Maintenance Verification inspections)
  1. TRCA. 2016. Fact Sheet - Inspection and Maintenance of Stormwater Best Management Practices: Enhanced Swales. https://sustainabletechnologies.ca/app/uploads/2018/02/Enhanced-Swales-Fact-Sheet.pdf
  2. Toronto and Region Conservation Authority (TRCA). 2019. Erosion and Sediment Control Guideline for Urban Construction. Toronto and Region Conservation Authority, Vaughan, Ontario. https://sustainabletechnologies.ca/app/uploads/2020/01/ESC-Guide-for-Urban-Construction_FINAL.pdf
  3. Connop S. and Nash, C. 2019. A Storm in a Bioswale: Breaking Down Barriers to Nature-Based Solutions. The Nature of Cities. 16 December 2019 Accessed: 4 July 2022. https://www.thenatureofcities.com/2019/12/16/a-storm-in-a-bioswale-breaking-down-barriers-to-nature-based-solutions/