User contributions
3 August 2022
Construction: erosion and sediment control inspection and maintenance
Erosion and sediment control inspection and maintenance
m−63
Construction: erosion and sediment control measures
Pre-construction: erosion and sediment control measures
m−62
Construction: communication, inspection plan, and utilities coordination
Communication, inspection plan, and utilities coordination
m−65
Construction: tendering and contract
Tendering and contract
m−29
Design verification and site walk-through
Design verification and site walk-through
m−51
Sub-surface components
no edit summary
m+351
Base course
Base course (permeable pavements)
m−41
Sub-base reservoir
Sub-base reservoir
m−26
Monitoring wells: Installation
Monitoring wells: installation
m−38
Overflow: Installation
Overflow: installation
m−30
Impermeable liners: Installation
Impermeable liners: installation
m−40
Underdrains: Installation
Underdrains: installation
m−33
Geotextiles: Installation
Geotextiles: Installation
m−31
Geotextiles: Installation
Geotextiles: Installation
m−2
Sub-surface components
Permeable pavement guidance
m−2
Base course
Base course
m+22
Monitoring wells: Installation
no edit summary
m+38
Overflow: Installation
no edit summary
m+30
Impermeable liners: Installation
no edit summary
m+40
Underdrains: Installation
no edit summary
m+33
Geotextiles: Installation
no edit summary
m+33
Sub-surface components
Created page with "{{:Geotextiles: Installation}} {{:Underdrains: Installation}} {{:Impermeable liners: Installation}} {{:Overflow: Installation}} {{:Monitoring wells: Installation}} {{:Construction: storage reservoir}} ===Permeable pavement guidance=== Because permeable pavements may be required to support heavy loads (driveways, laneways, etc.), the sub-base and base course may require compaction to prevent heaving and shifting. {{:Sub-base reservoir}} {{:Base course}} {{:Const..."
Base course
Created page with "===Base course=== In permeable pavement systems, the base course lies on top of the sub-base reservoir. See the Permeable pavements: Specifications page for base material specifications. The construction steps, key inspection points, and mistakes to avoid for the base course are the same as the guidance given in the storage reservoir section. However, depending on the municipality and the design, compaction of the base course may be required. For example, the City of..."
Sub-base reservoir
no edit summary
m+22
Sub-base reservoir
Created page with "In permeable pavement systems, the sub-base is the layer of granular material that is laid on the sub-grade. The granular sub-base should be clear, crushed 50 mm stone. See the Permeable pavements: Specifications page for detailed sub-base material specifications. The construction steps, key inspection points, and mistakes to avoid for sub-base reservoir are the same as / similar to the guidance given in the storage reservoir section. However, depending on the municipal..."
Construction
Construction stages
m+407
Construction
Construction stages
m−17
Construction
Construction stages
m+43
Construction: erosion and sediment control inspection and maintenance
Erosion and sediment control inspection and maintenance
m+1
Construction: erosion and sediment control inspection and maintenance
Erosion and sediment control inspection and maintenance
m−1
Construction: erosion and sediment control inspection and maintenance
Erosion and sediment control inspection and maintenance
m+5
Design verification and site walk-through
no edit summary
m−22
Design verification and site walk-through
Design verification and site walk-through
m+23
Pre-construction
no edit summary
m+1
Pre-construction
no edit summary
m−1
Construction
Construction stages
m+54
Construction
Construction stages
m+983
2 August 2022
Construction
no edit summary
m+63
Bioretention: Construction
Construction Tasks Table
mExcavation and grading
Created page with "==Excavation and grading== {{:Construction: clearing and grubbing}} {{:Construction: excavation and rough grade}} {{:Construction: final excavated grade and verification}}"
Construction
no edit summary
m−13
Construction
no edit summary
m+21
Construction
no edit summary
m+798
Construction
no edit summary
m+456
Design verification and site walk-through
Design verification and site walk-through
m−14
Construction
no edit summary
m+815
Construction
Overview
m+226
Design verification and site walk-through
Design verification and site walk-through
m+24
Bioretention: Construction
Construction Tasks Table
m+1
Bioretention: Construction
Construction Tasks Table
m+70