Pre-construction activities set the stage for the successful construction of an LID practice. The pre-construction stage begins by field-verifying the design when it is at the 90% completion stage.
Pre-construction activities set the stage for the successful construction of '''an LID''' practice. The pre-construction page gives guidance on:
*design verification and site walk-through
*LID construction notes
*tendering and contract
*communication, inspection plan, and utilities coordination
*Erosion and sediment control measures
*Mobilization, access, staging, and perimeter controls
The pre-construction stage should begin by field-verifying the design when it is at the 90% completion stage and conducting a site walk-through.
===Excavation and grading===
===Excavation and grading===
===Backfill granular, utilities, and pipes===
===Backfill granular, utilities, and pipes===
Sub-surface layers
===Finishing grades and surface layer===
===Finishing grades and surface layer===
Where things get a little tricky
===Post-construction===
===Post-construction===
If you assume the works too early, u make and ass out of me.