*communication, inspection plan, and utilities coordination
*communication, inspection plan, and utilities coordination
*Erosion and sediment control measures
*Erosion and sediment control measures
*Mobilization, access, staging, and perimeter controls
*mobilization, access, staging, and perimeter controls
 
 
 
The pre-construction stage should begin by field-verifying the design when it is at the 90% completion stage and conducting a site walk-through.   
 
===Excavation and grading===  
===Excavation and grading===  
Excavation and grading are necessary for installing LID practices with sub-surface components, re-grading land to hold more water, and re-routing overland flow routes into the LID practice in question. The excavation and grading page gives guidance on:
*clearing and grubbing
*excavation and rough grade
*final excavated grade and verification


===Backfill granular, utilities, and pipes===
Many LID practices rely on sub-surface features--storage reservoirs, liners, underdrains, etc.--to function. The '''backfill granular, utilities, and pipes / sub-surface components''' page gives guidance on:
*geotextile (if applicable)
*underdrain
*impermeable liners
*overflow
*monitoring wells
*storage reservoir
*stone choker layer
*curbing
*pre-treatment and inlet


===Backfill granular, utilities, and pipes===
===Finishing grades and surface layer installation===
Sub-surface layers


===Finishing grades and surface layer===
*soil media installation and soil amendment
Where things get a little tricky
*finish grading
*large stone and riprap
*plant verification and installation
*mulch placement
*stabilizing contributing drainage area and planting adjacent vegetation
*as-built survey


===Post-construction===
===Post-construction===
Line 43: Line 59:

==LID practice pages==
==LID practice pages==
Each construction page listed below :)