Line 4: Line 4:
#Use the same datum as the pre-engineering survey
#Use the same datum as the pre-engineering survey
#If a pre-engineering survey is not available, use a reference feature as the datum
#If a pre-engineering survey is not available, use a reference feature as the datum
#Identify the type, diameter, and material of exposed utilities
#Include data on critical feature elevations and existing utilities, such as:
#Include data on critical feature elevations and existing utilities, such as:
*Inverts of newly installed pipe
*Inverts of newly installed pipe
Line 9: Line 10:
*Existing public utilities
*Existing public utilities
*Existing private utilities
*Existing private utilities
*New and existing structures (e.g., catchbasins, manholes, chambers, etc.)
*New and existing structures (e.g., catchbasins, manholes, chambers, etc.)<sb>
#Identify the type, diameter, and material of exposed utilities


Inspection Points:
Inspection Points:<sb>
*Datum matches the pre-engineering survey or selected reference feature
*Datum matches the pre-engineering survey or selected reference feature
*Data provided in as-built survey matches the as-built standards of the local municipality
*Data provided in as-built survey matches the as-built standards of the local municipality<sb>