Throughout the construction process, it is sometimes necessary to deviate from the intended design of LID features and adapt the design to on-site conditions. The completion of a post-construction as-built survey is a standard operating procedure for engineering projects that captures any changes made to the feature’s design during construction.<sb>
Throughout the construction process, it is sometimes necessary to deviate from the intended design of LID features and adapt the design to on-site conditions. The completion of a post-construction as-built survey is a standard operating procedure for engineering projects that captures any changes made to the feature’s design during construction.<br>
Survey Steps:
Survey Steps:<br>
#Use the same datum as the pre-engineering survey
#Use the same datum as the pre-engineering survey
#If a pre-engineering survey is not available, use a reference feature as the datum
#If a pre-engineering survey is not available, use a reference feature as the datum
Line 10:
Line 10:
*Existing public utilities
*Existing public utilities
*Existing private utilities
*Existing private utilities
*New and existing structures (e.g., catchbasins, manholes, chambers, etc.)<sb>
*New and existing structures (e.g., catchbasins, manholes, chambers, etc.)<br>
Inspection Points:<sb>
Inspection Points:<br>
*Datum matches the pre-engineering survey or selected reference feature
*Datum matches the pre-engineering survey or selected reference feature
*Data provided in as-built survey matches the as-built standards of the local municipality<sb>
*Data provided in as-built survey matches the as-built standards of the local municipality<br>