Line 4: |
Line 4: |
| #Use the same datum as the pre-engineering survey | | #Use the same datum as the pre-engineering survey |
| #If a pre-engineering survey is not available, use a reference feature as the datum | | #If a pre-engineering survey is not available, use a reference feature as the datum |
| | #Identify the type, diameter, and material of exposed utilities |
| #Include data on critical feature elevations and existing utilities, such as: | | #Include data on critical feature elevations and existing utilities, such as: |
| *Inverts of newly installed pipe | | *Inverts of newly installed pipe |
Line 9: |
Line 10: |
| *Existing public utilities | | *Existing public utilities |
| *Existing private utilities | | *Existing private utilities |
| *New and existing structures (e.g., catchbasins, manholes, chambers, etc.) | | *New and existing structures (e.g., catchbasins, manholes, chambers, etc.)<sb> |
| #Identify the type, diameter, and material of exposed utilities
| |
|
| |
|
| Inspection Points: | | Inspection Points:<sb> |
| *Datum matches the pre-engineering survey or selected reference feature | | *Datum matches the pre-engineering survey or selected reference feature |
| *Data provided in as-built survey matches the as-built standards of the local municipality | | *Data provided in as-built survey matches the as-built standards of the local municipality<sb> |