| Throughout the construction process, it is sometimes necessary to deviate from the intended design of LID features and adapt the design to on-site conditions. The completion of a post-construction as-built survey is a standard operating procedure for engineering projects that captures any changes made to the feature’s design during construction.<sb> | | Throughout the construction process, it is sometimes necessary to deviate from the intended design of LID features and adapt the design to on-site conditions. The completion of a post-construction as-built survey is a standard operating procedure for engineering projects that captures any changes made to the feature’s design during construction.<br> |
|
| |
|
| Survey Steps: | | Survey Steps:<br> |
| #Use the same datum as the pre-engineering survey | | #Use the same datum as the pre-engineering survey |
| #If a pre-engineering survey is not available, use a reference feature as the datum | | #If a pre-engineering survey is not available, use a reference feature as the datum |
Line 10: |
Line 10: |
| *Existing public utilities | | *Existing public utilities |
| *Existing private utilities | | *Existing private utilities |
| *New and existing structures (e.g., catchbasins, manholes, chambers, etc.)<sb> | | *New and existing structures (e.g., catchbasins, manholes, chambers, etc.)<br> |
|
| |
|
| Inspection Points:<sb> | | Inspection Points:<br> |
| *Datum matches the pre-engineering survey or selected reference feature | | *Datum matches the pre-engineering survey or selected reference feature |
| *Data provided in as-built survey matches the as-built standards of the local municipality<sb> | | *Data provided in as-built survey matches the as-built standards of the local municipality<br> |