Line 154: |
Line 154: |
| !<br>'''<u><span title="Note for Observation Column: S = Satisfactory; U= Unsatisfactory; NA = Not Applicable ">Observations*</u>'''<br> | | !<br>'''<u><span title="Note for Observation Column: S = Satisfactory; U= Unsatisfactory; NA = Not Applicable ">Observations*</u>'''<br> |
| |- | | |- |
| |rowspan="6"|'''Site Preparation''' - after site clearing and grading, prior to BMP excavation and grading | | |rowspan="4"|'''Site Preparation''' - During site preparation, prior to BMP installation |
| |Natural heritage system and tree protection areas remain fenced off | | |Ensure the roof structure is ready for green roof construction work |
| | | | | |
| |- | | |- |
| |ESCs protecting BMP layout area are installed properly | | |BMP layout area and dimensions match approved design drawings |
| | | | | |
| |- | | |- |
Line 164: |
Line 164: |
| | | | | |
| |- | | |- |
| |BMP layout area has been cleared and is staked/delineated | | |Construction materials have been confirmed to meet design specifications |
| | | | | |
| |- | | |- |
| |Benchmark elevation(s) are established nearby | | |rowspan="1"|'''Leak detection System''' - After installation of leak detection system (if applicable), prior to installation of water-proofing membrane |
| | |Quality control check leak detection system installation |
| | |- |
| | |rowspan="2"|'''Water Proofing Membrane''' – After installation of waterproofing membrane, prior to installation of root barrier, drainage layer and overflow outlets |
| | |Quality control check membrane installation |
| | | | | |
| |- | | |- |
| |Construction materials have been confirmed to meet design specifications | | |Confirm that slopes conform with approved design drawings |
| | | | | |
| |- | | |- |
| |rowspan="2"|'''BMP Excavation and Grading''' - prior to backfilling and installation of pipes/catchbasins | | |rowspan="3"|'''Root barrier / Drainage layer and Overflow outlets''' – After installation of root barrier, drainage layer (including filter fabric) and overflow outlets, prior to installation of growing medium layer and plants |
| |Excavated soil is stockpiled outside the CDA | | |Quality control check root barrier and drainage layer installations |
| | | |
| | |Installation of drainage layer (e.g., depth and slope) is acceptable |
| | | | | |
| |- | | |Installations of overflow outlets (e.g., elevation and slope) are acceptable |
| |Excavation location, footprint, depth and slope are acceptable
| |
| | | | | |
| |- | | |- |
| |rowspan="6"|'''BMP Installation''' – after installation of pipes/catchbasins, prior to completion of backfilling | | |rowspan="5"|'''Filter bed''' – After installation of filter bed (growing medium layer and plants) |
| |Structural components (e.g., pavement base, curbs) installation is acceptable | | |Quality control check installation of any structural components of growing medium layer (if applicable) |
| |
| |
| |- | | |- |
| |Impermeable liner installed correctly, if applicable | | |Installation of growing medium (e.g., depth, elevations at overflow outlets) is acceptable |
| |
| |
| |- | | |- |
| |Installations of sub-drain pipes (e.g., locations, elevations, slopes), standpipes/monitoring wells are acceptable | | |Growing medium is free of ruts, local depressions |
| |
| |
| |- | | |- |
| |Sub-drain trench dams installed correctly (location, elevation) | | |Planting material meets approved planting plan specifications (plant types and quantities) |
| |
| |
| |- | | |- |
| |Surface coarse installation (elevation, slope, monitoring wells) is acceptable | | |Quality control check installation of erosion matting/protection (if applicable) |
| |
| |
| |- | | |- |
| | |rowspan="1"|'''Irrigation System''' - After installation of irrigation system |
| | |Confirm installation is acceptable and system is functioning (through testing) |
| |} | | |} |