!<br>'''<u><span title="Note for Observation Column: S = Satisfactory; U= Unsatisfactory; NA = Not Applicable ">Observations*</u>'''<br>
!<br>'''<u><span title="Note for Observation Column: S = Satisfactory; U= Unsatisfactory; NA = Not Applicable ">Observations*</u>'''<br>
|-
|-
|rowspan="6"|'''Site Preparation''' - after site clearing and grading, prior to BMP excavation and grading
|rowspan="4"|'''Site Preparation''' - During site preparation, prior to BMP installation
|Natural heritage system and tree protection areas remain fenced off
|Ensure the roof structure is ready for green roof construction work
|
|
|-
|-
|ESCs protecting BMP layout area are installed properly
|BMP layout area and dimensions match approved design drawings
|
|
|-
|-
Line 164: Line 164:
|
|
|-
|-
|BMP layout area has been cleared and is staked/delineated
|Construction materials have been confirmed to meet design specifications
|
|
|-  
|-  
|Benchmark elevation(s) are established nearby
|rowspan="1"|'''Leak detection System''' - After installation of leak detection system (if applicable), prior to installation of water-proofing membrane
|Quality control check leak detection system installation
|-
|rowspan="2"|'''Water Proofing Membrane''' – After installation of waterproofing membrane, prior to installation of root barrier, drainage layer and overflow outlets
|Quality control check membrane installation
|
|
|-
|-
|Construction materials have been confirmed to meet design specifications
|Confirm that slopes conform with approved design drawings
|
|
|-
|-
|rowspan="2"|'''BMP Excavation and Grading''' - prior to backfilling and installation of pipes/catchbasins
|rowspan="3"|'''Root barrier / Drainage layer and Overflow outlets''' – After installation of root barrier, drainage layer (including filter fabric) and overflow outlets, prior to installation of growing medium layer and plants
|Excavated soil is stockpiled outside the CDA
|Quality control check root barrier and drainage layer installations
|
|Installation of drainage layer (e.g., depth and slope) is acceptable
|
|
|-
|Installations of overflow outlets (e.g., elevation and slope) are acceptable
|Excavation location, footprint, depth and slope are acceptable  
|
|
|-
|-
|rowspan="6"|'''BMP Installation''' – after installation of pipes/catchbasins, prior to completion of backfilling
|rowspan="5"|'''Filter bed''' – After installation of filter bed (growing medium layer and plants)
|Structural components (e.g., pavement base, curbs) installation is acceptable
|Quality control check installation of any structural components of growing medium layer (if applicable)  
|
|-
|-
|Impermeable liner installed correctly, if applicable
|Installation of growing medium (e.g., depth, elevations at overflow outlets) is acceptable
|
|-
|-
|Installations of sub-drain pipes (e.g., locations, elevations, slopes), standpipes/monitoring wells are acceptable
|Growing medium is free of ruts, local depressions
|
|-
|-
|Sub-drain trench dams installed correctly (location, elevation)  
|Planting material meets approved planting plan specifications (plant types and quantities)  
|
|-
|-
|Surface coarse installation (elevation, slope, monitoring wells) is acceptable
|Quality control check installation of erosion matting/protection (if applicable)
|
|-
|-
|rowspan="1"|'''Irrigation System''' - After installation of irrigation system
|Confirm installation is acceptable and system is functioning (through testing)
|}
|}