Line 167:
Line 167:
|
|
|-
|-
|rowspan="1"|'''Leak detection System''' - After installation of leak detection system (if applicable), prior to installation of water-proofing membrane
|'''Leak detection System''' - After installation of leak detection system (if applicable), prior to installation of water-proofing membrane
|Quality control check leak detection system installation
|Quality control check leak detection system installation
|
|-
|-
|rowspan="2"|'''Water Proofing Membrane''' – After installation of waterproofing membrane, prior to installation of root barrier, drainage layer and overflow outlets
|rowspan="2"|'''Water Proofing Membrane''' – After installation of waterproofing membrane, prior to installation of root barrier, drainage layer and overflow outlets
Line 180:
Line 181:
|Quality control check root barrier and drainage layer installations
|Quality control check root barrier and drainage layer installations
|
|
|-
|Installation of drainage layer (e.g., depth and slope) is acceptable
|Installation of drainage layer (e.g., depth and slope) is acceptable
|
|
|-
|Installations of overflow outlets (e.g., elevation and slope) are acceptable
|Installations of overflow outlets (e.g., elevation and slope) are acceptable
|
|
Line 187:
Line 190:
|rowspan="5"|'''Filter bed''' – After installation of filter bed (growing medium layer and plants)
|rowspan="5"|'''Filter bed''' – After installation of filter bed (growing medium layer and plants)
|Quality control check installation of any structural components of growing medium layer (if applicable)
|Quality control check installation of any structural components of growing medium layer (if applicable)
|
|-
|-
|Installation of growing medium (e.g., depth, elevations at overflow outlets) is acceptable
|Installation of growing medium (e.g., depth, elevations at overflow outlets) is acceptable
|
|-
|-
|Growing medium is free of ruts, local depressions
|Growing medium is free of ruts, local depressions
|
|-
|-
|Planting material meets approved planting plan specifications (plant types and quantities)
|Planting material meets approved planting plan specifications (plant types and quantities)
|
|-
|-
|Quality control check installation of erosion matting/protection (if applicable)
|Quality control check installation of erosion matting/protection (if applicable)
|
|-
|-
|rowspan="1"|'''Irrigation System''' - After installation of irrigation system
|'''Irrigation System''' - After installation of irrigation system
|Confirm installation is acceptable and system is functioning (through testing)
|Confirm installation is acceptable and system is functioning (through testing)
|
|-
|}
|}