*Manage and demarcate heavy equipment routes away from LID practices.
*Manage and demarcate heavy equipment routes away from LID practices.
*Use simple, common-sense methods, such as scarifying exposed soils perpendicular to the grade to prevent the development of rills.
*Use simple, common-sense methods, such as scarifying exposed soils perpendicular to the grade to prevent the development of rills.
*Create and use a pollution prevention plan for any fuels or solvents.
*Create and use a [[pollution prevention]] plan for fuels or solvents.
Generally, all exposed soils that are not being actively worked on must have temporary erosion protection or permanent cover within 7 days for slopes 3:1 or greater and 14 days for slopes 3:1 or lesser and 14 days for slopes 3:1 or flatter. This should apply to all exposed soil areas year-round and until the site is stabilized. <br>
Generally, all exposed soils that are not being actively worked on must have temporary erosion protection or permanent cover within 7 days for slopes 3:1 or greater and 14 days for slopes 3:1 or lesser and 14 days for slopes 3:1 or flatter. This should apply to all exposed soil areas year-round and until the site is stabilized. <br>


Line 47: Line 47:
|'''Stockpiles'''
|'''Stockpiles'''
|  
|  
*Sling soil and aggregates into the facility when possible.
*Sling soil and [[aggregates]] into the facility when possible.
*Install soil and aggregates upon arrival to the site when possible.
*Install soil and aggregates upon arrival to the site when possible.
|
|
*Store materials within the stormwater management system, e.g., in the roadway.  
*Store materials within the stormwater management system, e.g., in the roadway.  
*Leave stockpiles unprotected when wet weather is expected
*Leave stockpiles unprotected when wet weather is expected.
|
|
[[File:P1090179 SlingerTruck.JPG|300px|thumb|center|(Photo source: CVC)]]
[[File:P1090179 SlingerTruck.JPG|300px|thumb|center|(Photo source: CVC)]]
Line 59: Line 59:
|'''Protecting features during construction, including using sacrificial filter fabric'''
|'''Protecting features during construction, including using sacrificial filter fabric'''
|
|
*Use sacrificial filter fabric when necessary to protect features, and leave ESC measures in place until all construction in the LID's drainage area is complete.
*Use sacrificial [[filter fabric]] when necessary to protect features, and leave ESC measures in place until all construction in the LID's drainage area is complete.
|
|
*Remove ESC measures early or allow sediment to enter the LID footprint.
*Remove ESC measures early or allow sediment to enter the LID footprint.