| *Manage and demarcate heavy equipment routes away from LID practices. | | *Manage and demarcate heavy equipment routes away from LID practices. |
| *Use simple, common-sense methods, such as scarifying exposed soils perpendicular to the grade to prevent the development of rills. | | *Use simple, common-sense methods, such as scarifying exposed soils perpendicular to the grade to prevent the development of rills. |
| *Create and use a pollution prevention plan for any fuels or solvents. | | *Create and use a [[pollution prevention]] plan for fuels or solvents. |
| Generally, all exposed soils that are not being actively worked on must have temporary erosion protection or permanent cover within 7 days for slopes 3:1 or greater and 14 days for slopes 3:1 or lesser and 14 days for slopes 3:1 or flatter. This should apply to all exposed soil areas year-round and until the site is stabilized. <br> | | Generally, all exposed soils that are not being actively worked on must have temporary erosion protection or permanent cover within 7 days for slopes 3:1 or greater and 14 days for slopes 3:1 or lesser and 14 days for slopes 3:1 or flatter. This should apply to all exposed soil areas year-round and until the site is stabilized. <br> |
|
| |
|
Line 47: |
Line 47: |
| |'''Stockpiles''' | | |'''Stockpiles''' |
| | | | | |
| *Sling soil and aggregates into the facility when possible. | | *Sling soil and [[aggregates]] into the facility when possible. |
| *Install soil and aggregates upon arrival to the site when possible. | | *Install soil and aggregates upon arrival to the site when possible. |
| | | | | |
| *Store materials within the stormwater management system, e.g., in the roadway. | | *Store materials within the stormwater management system, e.g., in the roadway. |
| *Leave stockpiles unprotected when wet weather is expected | | *Leave stockpiles unprotected when wet weather is expected. |
| | | | | |
| [[File:P1090179 SlingerTruck.JPG|300px|thumb|center|(Photo source: CVC)]] | | [[File:P1090179 SlingerTruck.JPG|300px|thumb|center|(Photo source: CVC)]] |
Line 59: |
Line 59: |
| |'''Protecting features during construction, including using sacrificial filter fabric''' | | |'''Protecting features during construction, including using sacrificial filter fabric''' |
| | | | | |
| *Use sacrificial filter fabric when necessary to protect features, and leave ESC measures in place until all construction in the LID's drainage area is complete. | | *Use sacrificial [[filter fabric]] when necessary to protect features, and leave ESC measures in place until all construction in the LID's drainage area is complete. |
| | | | | |
| *Remove ESC measures early or allow sediment to enter the LID footprint. | | *Remove ESC measures early or allow sediment to enter the LID footprint. |