Changes

Jump to navigation Jump to search
m
Line 271: Line 271:
or bioswale.
or bioswale.
Before starting a large-scale retrofit project, consider the
Before starting a large-scale retrofit project, consider the
following distinctions that set these retrofits apart from smallscale
following distinctions that set these retrofits apart from small-scale
projects.
projects.
===Integration with long-term infrastructure
===Integration with long-term infrastructure replacement and rehabilitation plans===
replacement and rehabilitation plans===
Most large-scale LID retrofits must function with existing
Most large-scale LID retrofits must function with existing
site infrastructure, such as storm sewers, catch basins,
site infrastructure, such as storm sewers, catch basins,
Line 293: Line 292:
have been set aside for a parking lot replacement could be
have been set aside for a parking lot replacement could be
transferred to a retrofit project.
transferred to a retrofit project.
===Involvement of consultants and contractors===
===Involvement of consultants and contractors===
Consultants are required for large-scale retrofit projects,
Consultants are required for large-scale retrofit projects,
722

edits

Navigation menu