Line 271: |
Line 271: |
| or bioswale. | | or bioswale. |
| Before starting a large-scale retrofit project, consider the | | Before starting a large-scale retrofit project, consider the |
| following distinctions that set these retrofits apart from smallscale | | following distinctions that set these retrofits apart from small-scale |
| projects. | | projects. |
| ===Integration with long-term infrastructure | | ===Integration with long-term infrastructure replacement and rehabilitation plans=== |
| replacement and rehabilitation plans=== | |
| Most large-scale LID retrofits must function with existing | | Most large-scale LID retrofits must function with existing |
| site infrastructure, such as storm sewers, catch basins, | | site infrastructure, such as storm sewers, catch basins, |
Line 293: |
Line 292: |
| have been set aside for a parking lot replacement could be | | have been set aside for a parking lot replacement could be |
| transferred to a retrofit project. | | transferred to a retrofit project. |
| | |
| ===Involvement of consultants and contractors=== | | ===Involvement of consultants and contractors=== |
| Consultants are required for large-scale retrofit projects, | | Consultants are required for large-scale retrofit projects, |