Changes
Jump to navigation
Jump to search
← Older edit
Newer edit →
LID opportunities on public land
(view source)
Revision as of 15:24, 18 December 2017
52 bytes added
,
6 years ago
m
→Large-scale projects
Line 252:
Line 252:
and staff than small-scale projects. Large-scale LID retrofits
and staff than small-scale projects. Large-scale LID retrofits
include:
include:
•
Bioretention
{{Div col|rules=yes|gap=2em|small=yes|colwidth=10em}}
•
Enhanced grass swales
*
Bioretention
•
Bioswales
*
Enhanced grass swales
•
Perforated pipe systems
*
Bioswales
•
Permeable pavement
*
Perforated pipe systems
•
Soakaways
*
Permeable pavement
•
Infiltration chambers
*
Soakaways
•
Rainwater harvesting (excluding rain barrels)
*
Infiltration chambers
•
Prefabricated modules
*
Rainwater harvesting (excluding rain barrels)
•
Green roofs
*
Prefabricated modules
*
Green roofs
{{Div col end}}
Consider a large-scale project if your school board is striving
Consider a large-scale project if your school board is striving
to be a leader in sustainability. Large-scale projects are often
to be a leader in sustainability. Large-scale projects are often
Line 273:
Line 276:
following distinctions that set these retrofits apart from small-scale
following distinctions that set these retrofits apart from small-scale
projects.
projects.
===Integration with long-term infrastructure replacement and rehabilitation plans===
===Integration with long-term infrastructure replacement and rehabilitation plans===
Most large-scale LID retrofits must function with existing
Most large-scale LID retrofits must function with existing
Kyle menken
722
edits
Navigation menu
Personal tools
English
Log in
Namespaces
Page
Discussion
Variants
expanded
collapsed
Views
Read
View source
View history
More
expanded
collapsed
Search
Navigation
Home
Table of contents
All pages
Recent changes
Responses to comments
Tools
Special pages
Printable version