Vegetated Filter Strips: Construction

From LID SWM Planning and Design Guide
Revision as of 19:28, 19 April 2022 by SamanthaPelayo (talk | contribs) (→‎Construction Tasks Described)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

This section is also applicable to: Swales Enhanced swales

Construction Tasks Table[edit]

Construction Tasks Described[edit]

Verification of Siting and LID Design
Installation of ESC and Construction Fencing
ESC Inspection and Maintenance (ongoing)
Clearing and Grubbing
Excavation
Rough Grade
Verification of Grading/Survey*
Scarification
Geotextile
Impermeable liner
Underdrain
Overflow or Overflow Drain
Monitoring well
Storage Reservoir
Stone Choker Layer
Curbing
Pre-treatment and Inlet
Soil Media / Filter Media
Finish Grading
Riprap (Large Stone)
Plant Material Verification and Installation
Mulch Placement
Stabilizing Contributing Drainage Area - Planting Adjacent Vegetation
As-built Survey
Permanent Fencing
Identify and Address Deficiencies
Assumption/Certification

Key Construction Inspection Points[edit]

Inspection Point Timeline[edit]

Construction Mistakes to Avoid[edit]

Construction Certifications Protocols[edit]