User contributions for Kyle menken
Jump to navigation
Jump to search
- 17:55, 22 September 2022 diff hist +670 m Construction →Construction stages and LID types
- 18:57, 13 September 2022 diff hist +69 m Finishing grades and surface layer installation: vegetated LIDs
- 18:57, 13 September 2022 diff hist +6 m Finishing grades and surface layer installation: vegetated LIDs
- 15:53, 13 September 2022 diff hist −13 m Pre-construction
- 15:51, 13 September 2022 diff hist 0 m Pre-construction →Mobilization, access, staging, and perimeter controls
- 15:51, 13 September 2022 diff hist −58 m Pre-construction →Erosion and sediment control measures
- 15:49, 13 September 2022 diff hist +185 m Pre-construction →Inspection plan
- 15:37, 13 September 2022 diff hist 0 N File:Construction duties flowchart.png current
- 15:33, 13 September 2022 diff hist 0 m Construction →Excavation and grading
- 15:32, 13 September 2022 diff hist +177 m Construction
- 15:28, 13 September 2022 diff hist 0 N File:Construction page lead photo.JPG current
- 15:26, 13 September 2022 diff hist 0 m Construction →Overview
- 14:00, 12 September 2022 diff hist +106 m Construction
- 13:32, 12 September 2022 diff hist +520 m Construction
- 13:23, 12 September 2022 diff hist +1,566 m Construction
- 12:12, 12 September 2022 diff hist +6 m Construction →Overview
- 18:06, 1 September 2022 diff hist +106 m Construction →Construction stages and LID types
- 17:49, 1 September 2022 diff hist +25 m Construction →Construction stages and LID types
- 17:47, 1 September 2022 diff hist +234 m Construction →Sub-surface components
- 17:43, 1 September 2022 diff hist −13 m Construction →Sub-surface components
- 17:51, 30 August 2022 diff hist 0 m Construction →Finishing grades and surface layer installation
- 17:50, 30 August 2022 diff hist −6 m Construction →Finishing grades and surface layer installation
- 16:49, 30 August 2022 diff hist −69 m Pre-construction →Minimum contractor requirements
- 16:02, 30 August 2022 diff hist +1 m Sub-surface components →Stone choker layer
- 15:30, 30 August 2022 diff hist +14 m Construction →Sub-surface components
- 19:23, 15 August 2022 diff hist +207 m Finishing grades and surface layer installation: permeable pavements
- 19:11, 15 August 2022 diff hist +4 m Finishing grades and surface layer installation: vegetated LIDs
- 18:51, 15 August 2022 diff hist +7,476 m Finishing grades and surface layer installation: vegetated LIDs
- 18:22, 15 August 2022 diff hist +8,333 m Sub-surface components
- 18:18, 15 August 2022 diff hist +10,286 m Sub-surface components
- 18:10, 15 August 2022 diff hist +4,901 m Excavation and grading
- 17:51, 15 August 2022 diff hist +17,607 m Pre-construction
- 14:31, 15 August 2022 diff hist +8 m Construction →Sub-surface components
- 17:32, 11 August 2022 diff hist 0 m Construction
- 17:30, 11 August 2022 diff hist +91 m Construction
- 17:27, 11 August 2022 diff hist +581 m Construction
- 15:50, 10 August 2022 diff hist −8 m Construction: erosion and sediment control measures
- 15:50, 10 August 2022 diff hist −3 m Construction: erosion and sediment control measures
- 15:49, 10 August 2022 diff hist −39 m Construction: erosion and sediment control measures
- 15:42, 10 August 2022 diff hist +20 m Construction →Excavation and grading
- 15:42, 10 August 2022 diff hist +214 m Construction →Finishing grades and surface layer installation
- 15:40, 10 August 2022 diff hist 0 N File:Planting CVC Janet I McDougald.JPG current
- 15:33, 10 August 2022 diff hist +138 m Construction →Excavation and grading
- 15:31, 10 August 2022 diff hist 0 N File:Excavation belfountain swale.JPG current
- 15:18, 10 August 2022 diff hist 0 m Construction
- 14:53, 10 August 2022 diff hist −30 m Construction: final excavated grade and verification
- 14:52, 10 August 2022 diff hist +59 m Construction: final excavated grade and verification
- 14:45, 10 August 2022 diff hist −133 m Construction: excavation and rough grade
- 14:40, 10 August 2022 diff hist 0 m Construction: clearing and grubbing
- 14:38, 10 August 2022 diff hist +31 m Construction: clearing and grubbing
- 14:36, 10 August 2022 diff hist +4 m Construction: mobilization, access, staging, and perimeter controls current
- 14:33, 10 August 2022 diff hist +9 m Construction: erosion and sediment control measures
- 14:20, 10 August 2022 diff hist +4 m Construction: erosion and sediment control measures
- 14:18, 10 August 2022 diff hist +51 m Construction: communication, inspection plan, and utilities coordination current
- 14:05, 10 August 2022 diff hist +8 m LID construction notes →LID construction notes current
- 14:03, 10 August 2022 diff hist +48 m Design verification and site walk-through current
- 13:37, 10 August 2022 diff hist 0 m Construction: final excavated grade and verification
- 13:23, 10 August 2022 diff hist 0 m Definition of Low Impact Development
- 13:22, 10 August 2022 diff hist +18 m Post-construction
- 13:20, 10 August 2022 diff hist +18 m Finishing grades and surface layer installation: vegetated LIDs
- 13:20, 10 August 2022 diff hist +18 m Sub-surface components
- 13:19, 10 August 2022 diff hist +18 m Excavation and grading
- 13:17, 10 August 2022 diff hist +17 m Pre-construction
- 13:15, 10 August 2022 diff hist +555 m Post-construction
- 13:09, 10 August 2022 diff hist −152 m Sub-surface components
- 13:03, 10 August 2022 diff hist +146 m Finishing grades and surface layer installation: vegetated LIDs
- 12:51, 10 August 2022 diff hist −28 m Construction: communication, inspection plan, and utilities coordination →Inspection plan
- 12:49, 10 August 2022 diff hist −8 m Excavation and grading Tag: Manual revert
- 12:49, 10 August 2022 diff hist +8 m Excavation and grading
- 12:48, 10 August 2022 diff hist −152 m Excavation and grading
- 12:45, 10 August 2022 diff hist −152 m Pre-construction
- 12:44, 10 August 2022 diff hist +30 m Finishing grades and surface layer installation: vegetated LIDs
- 12:37, 10 August 2022 diff hist +768 m Finishing grades and surface layer installation: vegetated LIDs
- 12:19, 10 August 2022 diff hist +635 m Sub-surface components
- 12:14, 10 August 2022 diff hist 0 m Excavation and grading
- 12:13, 10 August 2022 diff hist 0 m Pre-construction
- 12:12, 10 August 2022 diff hist +778 m Excavation and grading
- 12:11, 10 August 2022 diff hist −1 m Pre-construction
- 12:10, 10 August 2022 diff hist −3 m Construction
- 12:02, 10 August 2022 diff hist +50 m Construction
- 11:52, 10 August 2022 diff hist +71 m Construction
- 19:18, 9 August 2022 diff hist −3 m Construction
- 19:12, 9 August 2022 diff hist +41 m Construction
- 19:09, 9 August 2022 diff hist +526 m Construction
- 18:27, 9 August 2022 diff hist −66 m Construction →Construction stages and LID types
- 18:18, 9 August 2022 diff hist −48 m Construction →Sub-surface components
- 18:15, 9 August 2022 diff hist +73 m Construction →Sub-surface components
- 18:12, 9 August 2022 diff hist +4 m Construction →Construction stages and LID types
- 15:50, 9 August 2022 diff hist +367 m Construction
- 12:28, 9 August 2022 diff hist +50 m Construction: final excavated grade and verification
- 12:20, 9 August 2022 diff hist +2 m Construction →Construction stages and LID types
- 12:20, 9 August 2022 diff hist +54 m Construction →Construction stages and LID types
- 12:16, 9 August 2022 diff hist +719 m Pre-construction
- 13:21, 8 August 2022 diff hist 0 m Construction
- 12:55, 8 August 2022 diff hist +116 m Construction: final excavated grade and verification
- 12:54, 8 August 2022 diff hist 0 N File:Trimble unit.JPG current
- 12:49, 8 August 2022 diff hist −30 m Excavation and grading
- 12:44, 8 August 2022 diff hist +474 m Construction: final excavated grade and verification
- 12:34, 8 August 2022 diff hist −31 m Construction
- 12:30, 8 August 2022 diff hist +180 m Construction →Post-construction
- 18:17, 4 August 2022 diff hist +75 m Pre-construction
- 17:59, 4 August 2022 diff hist +111 m Construction →Construction stages and LID types
- 17:51, 4 August 2022 diff hist 0 N File:Construction process.jpg current
- 15:08, 4 August 2022 diff hist −10 m Construction →Finishing grades and surface layer installation
- 15:05, 4 August 2022 diff hist +131 m Construction →Finishing grades and surface layer installation
- 14:54, 4 August 2022 diff hist +6 m Construction →Sub-surface components
- 14:53, 4 August 2022 diff hist +36 m Construction →Sub-surface components
- 14:52, 4 August 2022 diff hist +16 m Sub-surface components →Permeable pavement guidance
- 14:51, 4 August 2022 diff hist +28 m Construction →Construction stages and LID types
- 14:49, 4 August 2022 diff hist −106 m Construction →Construction stages and LID types
- 14:39, 4 August 2022 diff hist +93 m Construction →Construction stages and LID types
- 14:38, 4 August 2022 diff hist −3 m Construction →Construction stages and LID types
- 14:38, 4 August 2022 diff hist +26 m Construction →Construction stages and LID types
- 14:30, 4 August 2022 diff hist +50 m Construction →Overview
- 14:18, 4 August 2022 diff hist +21 m Construction →Construction stages and LID types
- 14:18, 4 August 2022 diff hist +6 m Construction →Finishing grades and surface layer installation
- 14:17, 4 August 2022 diff hist −4 m Construction →Construction stages and LID types
- 14:16, 4 August 2022 diff hist +4 m Construction →Finishing grades and surface layer installation
- 14:14, 4 August 2022 diff hist +12 m Construction: soil media and amendment
- 14:11, 4 August 2022 diff hist +698 N Finishing grades and surface layer installation: vegetated LIDs Created page with "==Overview== ''insert blurb here'' ==Soil media and amendments== {{:Construction: soil media and amendment}} ==Finish grading== {{:Construction: finish grading}} ==Large stone and riprap== {{:Construction: large stone and riprap}} ==Plant material verification and installation== {{:Construction: plant material verification and installation}} ==Mulch placement== {{:Construction: mulch placement}}..."
- 14:02, 4 August 2022 diff hist +88 m Construction →Finishing grades and surface layer installation
- 13:56, 4 August 2022 diff hist −182 m Construction →Finishing grades and surface layer installation
- 13:53, 4 August 2022 diff hist +216 m Construction
- 13:52, 4 August 2022 diff hist −201 m Construction →Finishing grades and surface layer installation
- 13:33, 4 August 2022 diff hist −106 m Construction →Finishing grades and surface layer installation
- 13:32, 4 August 2022 diff hist +187 m Construction →Finishing grades and surface layer installation
- 13:15, 4 August 2022 diff hist +854 m Construction
- 19:12, 3 August 2022 diff hist 0 m Construction →Construction stages
- 18:55, 3 August 2022 diff hist +4 m Construction →Sub-surface components
- 18:54, 3 August 2022 diff hist +11 m Construction →Excavation and grading
- 18:53, 3 August 2022 diff hist −74 m Construction: final excavated grade and verification →Excavation and mass grading: final excavated grade and verification
- 18:53, 3 August 2022 diff hist −57 m Construction: clearing and grubbing →Excavation and mass grading: clearing and grubbing
- 18:53, 3 August 2022 diff hist −45 m Construction: excavation and rough grade →Excavation and mass grading: excavation
- 18:51, 3 August 2022 diff hist +125 m Excavation and grading →Excavation and grading
- 18:49, 3 August 2022 diff hist +15 m Excavation and grading
- 18:48, 3 August 2022 diff hist +735 N Sub-grade Created page with "The term “sub-grade” refers to the excavated bottom of native soils that forms the bottom of a ground-level LID practice. Excavation to the subgrade will differ depending on whether the design is for an infiltrating or a non-infiltrating LID system. If it’s an infiltrating practice, the sub-grade should be as level as possible to promote even infiltration across the facility’s footprint. For non-infiltrating practices, excavate sub-grade slopes to the design gra..." current
- 18:44, 3 August 2022 diff hist +5 m Construction →Construction stages
- 18:44, 3 August 2022 diff hist +141 N Post-construction Created page with "==Overview== ''insert blurb here'' ==Addressing deficiencies== {{:Addressing deficiencies}} ==Final certification== {{:Final Certification}}"
- 18:35, 3 August 2022 diff hist −2 m Construction →Post-construction
- 18:35, 3 August 2022 diff hist +3 m Construction →Construction stages
- 18:33, 3 August 2022 diff hist +567 N Finishing grades: inlet, outlet, and surface layer Created page with "==Soil media and amendments== {{:Construction: soil media and amendment}} ==Finish grading== {{:Construction: finish grading}} ==Large stone and riprap== {{:Construction: large stone and riprap}} ==Plant material verification and installation== {{:Construction: plant material verification and installation}} ==Mulch placement== {{:Construction: mulch placement}} ==Stabilizing contributing drainage area== {{:Construction: stabilizing contributing drainage area}}..." current
- 18:23, 3 August 2022 diff hist +4 m Construction →Overview
- 18:22, 3 August 2022 diff hist +39 m Construction →Overview
- 18:22, 3 August 2022 diff hist −3 m Construction →Finishing grades and surface layer installation
- 18:18, 3 August 2022 diff hist −2 m Construction →Sub-surface components
- 18:18, 3 August 2022 diff hist −2 m Construction →Excavation and grading
- 18:17, 3 August 2022 diff hist −4 m Construction →Pre-construction
- 18:10, 3 August 2022 diff hist 0 m Construction →Construction stages
- 17:52, 3 August 2022 diff hist +330 m Pre-construction
- 17:00, 3 August 2022 diff hist −78 m Construction: mobilization, access, staging, and perimeter controls →Pre-construction: mobilization, access, staging, and perimeter controls
- 17:00, 3 August 2022 diff hist −63 m Construction: erosion and sediment control inspection and maintenance →Erosion and sediment control inspection and maintenance current
- 17:00, 3 August 2022 diff hist −62 m Construction: erosion and sediment control measures →Pre-construction: erosion and sediment control measures
- 16:59, 3 August 2022 diff hist −65 m Construction: communication, inspection plan, and utilities coordination →Communication, inspection plan, and utilities coordination
- 16:59, 3 August 2022 diff hist −29 m Construction: tendering and contract →Tendering and contract current
- 16:59, 3 August 2022 diff hist −51 m Design verification and site walk-through →Design verification and site walk-through
- 16:52, 3 August 2022 diff hist +351 m Sub-surface components
- 16:46, 3 August 2022 diff hist −41 m Base course →Base course (permeable pavements) current
- 16:46, 3 August 2022 diff hist −26 m Sub-base reservoir →Sub-base reservoir current
- 16:45, 3 August 2022 diff hist −38 m Monitoring wells: Installation →Monitoring wells: installation Tag: Manual revert
- 16:44, 3 August 2022 diff hist −30 m Overflow: Installation →Overflow: installation Tag: Manual revert
- 16:44, 3 August 2022 diff hist −40 m Impermeable liners: Installation →Impermeable liners: installation Tag: Manual revert
- 16:44, 3 August 2022 diff hist −33 m Underdrains: Installation →Underdrains: installation Tag: Manual revert
- 16:43, 3 August 2022 diff hist −31 m Geotextiles: Installation →Geotextiles: Installation Tag: Manual revert
- 16:43, 3 August 2022 diff hist −2 m Geotextiles: Installation →Geotextiles: Installation
- 16:42, 3 August 2022 diff hist −2 m Sub-surface components →Permeable pavement guidance
- 16:42, 3 August 2022 diff hist +22 m Base course →Base course
- 16:41, 3 August 2022 diff hist +38 m Monitoring wells: Installation
- 16:41, 3 August 2022 diff hist +30 m Overflow: Installation
- 16:40, 3 August 2022 diff hist +40 m Impermeable liners: Installation
- 16:39, 3 August 2022 diff hist +33 m Underdrains: Installation
- 16:38, 3 August 2022 diff hist +33 m Geotextiles: Installation
- 16:37, 3 August 2022 diff hist +575 N Sub-surface components Created page with "{{:Geotextiles: Installation}} {{:Underdrains: Installation}} {{:Impermeable liners: Installation}} {{:Overflow: Installation}} {{:Monitoring wells: Installation}} {{:Construction: storage reservoir}} ===Permeable pavement guidance=== Because permeable pavements may be required to support heavy loads (driveways, laneways, etc.), the sub-base and base course may require compaction to prevent heaving and shifting. {{:Sub-base reservoir}} {{:Base course}} {{:Const..."
- 16:28, 3 August 2022 diff hist +931 N Base course Created page with "===Base course=== In permeable pavement systems, the base course lies on top of the sub-base reservoir. See the Permeable pavements: Specifications page for base material specifications. The construction steps, key inspection points, and mistakes to avoid for the base course are the same as the guidance given in the storage reservoir section. However, depending on the municipality and the design, compaction of the base course may be required. For example, the City of..."
- 16:25, 3 August 2022 diff hist +22 m Sub-base reservoir
- 16:23, 3 August 2022 diff hist +1,029 N Sub-base reservoir Created page with "In permeable pavement systems, the sub-base is the layer of granular material that is laid on the sub-grade. The granular sub-base should be clear, crushed 50 mm stone. See the Permeable pavements: Specifications page for detailed sub-base material specifications. The construction steps, key inspection points, and mistakes to avoid for sub-base reservoir are the same as / similar to the guidance given in the storage reservoir section. However, depending on the municipal..."
- 16:15, 3 August 2022 diff hist +407 m Construction →Construction stages
- 15:46, 3 August 2022 diff hist −17 m Construction →Construction stages
- 15:46, 3 August 2022 diff hist +43 m Construction →Construction stages
- 15:38, 3 August 2022 diff hist +1 m Construction: erosion and sediment control inspection and maintenance →Erosion and sediment control inspection and maintenance
- 15:37, 3 August 2022 diff hist −1 m Construction: erosion and sediment control inspection and maintenance →Erosion and sediment control inspection and maintenance
- 15:36, 3 August 2022 diff hist +5 m Construction: erosion and sediment control inspection and maintenance →Erosion and sediment control inspection and maintenance
- 15:33, 3 August 2022 diff hist −22 m Design verification and site walk-through
- 15:31, 3 August 2022 diff hist +23 m Design verification and site walk-through →Design verification and site walk-through
- 15:10, 3 August 2022 diff hist +1 m Pre-construction Tag: Manual revert
- 15:06, 3 August 2022 diff hist −1 m Pre-construction
- 14:46, 3 August 2022 diff hist +54 m Construction →Construction stages
- 14:44, 3 August 2022 diff hist +983 m Construction →Construction stages
- 19:24, 2 August 2022 diff hist +63 m Construction
- 19:23, 2 August 2022 diff hist 0 m Bioretention: Construction →Construction Tasks Table current
- 19:11, 2 August 2022 diff hist +172 N Excavation and grading Created page with "==Excavation and grading== {{:Construction: clearing and grubbing}} {{:Construction: excavation and rough grade}} {{:Construction: final excavated grade and verification}}"
- 19:10, 2 August 2022 diff hist −13 m Construction
- 19:08, 2 August 2022 diff hist +21 m Construction
- 19:02, 2 August 2022 diff hist +798 m Construction
- 18:03, 2 August 2022 diff hist +456 m Construction
- 17:52, 2 August 2022 diff hist −14 m Design verification and site walk-through →Design verification and site walk-through
- 17:47, 2 August 2022 diff hist +815 m Construction
- 16:02, 2 August 2022 diff hist +226 m Construction →Overview
- 15:33, 2 August 2022 diff hist +24 m Design verification and site walk-through →Design verification and site walk-through
- 15:29, 2 August 2022 diff hist +1 m Bioretention: Construction →Construction Tasks Table
- 15:29, 2 August 2022 diff hist +70 m Bioretention: Construction →Construction Tasks Table
- 15:12, 2 August 2022 diff hist −3 m Bioretention: Construction →Construction Tasks Table
- 14:34, 2 August 2022 diff hist −19 m Construction: communication, inspection plan, and utilities coordination →Pre-construction: communication, inspection plan, and utilities coordination
- 14:33, 2 August 2022 diff hist −18 m Construction: tendering and contract →Pre-construction: tendering and contract
- 14:33, 2 August 2022 diff hist −18 m LID construction notes →Pre-construction: LID construction notes Tag: Manual revert
- 14:33, 2 August 2022 diff hist −18 m Design verification and site walk-through →Pre-construction: design verification and site walk-through
- 14:32, 2 August 2022 diff hist +421 N Pre-construction Created page with "{{TOClimit|2}} {{:Design verification and site walk-through}} {{:LID construction notes}} {{:Construction: tendering and contract}} {{:Construction: communication, inspection plan, and utilities coordination}} {{:Construction: erosion and sediment control measures}} {{:Construction: erosion and sediment control inspection and maintenance}} {{:Construction: mobilization, access, staging, and perimeter controls}}"
- 14:29, 2 August 2022 diff hist −5,443 m Construction Replaced content with "{{TOClimit|2}} ==Overview== *''Importance of construction inspections'' *''Building capacity in the construction industry'' STEP divides the construction process for LID practices into five categories: #Pre-construction #Excavation and grading #Backfill granular, utilities and pipes #Finishing grades: inlet, outlet, and surface layer #Post-construction Pre-construction" Tag: Replaced
- 14:03, 2 August 2022 diff hist −51 m Construction
- 13:29, 2 August 2022 diff hist +369 m Construction: erosion and sediment control inspection and maintenance →Erosion and sediment control inspection and maintenance
- 13:23, 2 August 2022 diff hist 0 N File:ESC ponding 2.png current
- 13:23, 2 August 2022 diff hist 0 N File:ESC ponding 1.png current
- 13:21, 2 August 2022 diff hist +82 m Construction: clearing and grubbing →Excavation and mass grading: clearing and grubbing
- 13:19, 2 August 2022 diff hist 0 m Construction: communication, inspection plan, and utilities coordination →Pre-construction: communication, inspection plan, and utilities coordination
- 13:08, 2 August 2022 diff hist +1 m Bioretention: Construction →Pre-Construction Tag: Manual revert
- 13:08, 2 August 2022 diff hist 0 m Bioretention: Construction →Pre-Construction
- 13:04, 2 August 2022 diff hist −1 m Bioretention: Construction →Pre-Construction
- 12:57, 2 August 2022 diff hist +6 m Construction: erosion and sediment control measures →Pre-construction: erosion and sediment control measures
- 12:56, 2 August 2022 diff hist +1 m Bioretention: Construction →Pre-Construction
- 12:54, 2 August 2022 diff hist +34 m Bioretention: Construction →Pre-Construction
- 12:51, 2 August 2022 diff hist +2 m Construction: erosion and sediment control inspection and maintenance
- 12:50, 2 August 2022 diff hist +529 N Construction: erosion and sediment control inspection and maintenance Created page with "===Erosion and sediment control inspection and maintenance=== ESC measures require ongoing attention to ensure integrity and performance. ESC inspections should take place, at minimum, during installation, after rainfall events, and at the critical inspection points discussed in the Pre-construction: communication, inspection plan, and utilities coordination section. At these inspections, keep an eye out for accumulated sediment, worn materials, compliance with the..."
- 12:25, 2 August 2022 diff hist −2 m Construction: erosion and sediment control measures →Pre-construction: erosion and sediment control measures
- 12:23, 2 August 2022 diff hist +2 m Construction: communication, inspection plan, and utilities coordination →Pre-construction: communication, inspection plan, and utilities coordination
- 12:12, 2 August 2022 diff hist +1 m Construction: communication, inspection plan, and utilities coordination →Pre-construction: communication, inspection plan, and utilities coordination
- 19:48, 28 July 2022 diff hist +32 m Construction: communication, inspection plan, and utilities coordination →Pre-construction: communication, inspection plan, and utilities coordination
- 19:40, 28 July 2022 diff hist +14 m Construction: erosion and sediment control measures →Pre-construction: erosion and sediment control measures
- 19:36, 28 July 2022 diff hist +52 m Construction: erosion and sediment control measures →Pre-construction: erosion and sediment control measures
- 19:16, 28 July 2022 diff hist −5 m Construction: erosion and sediment control measures →Pre-construction: erosion and sediment control measures
- 19:13, 28 July 2022 diff hist +62 m Construction: erosion and sediment control measures →Pre-construction: erosion and sediment control measures
- 19:09, 28 July 2022 diff hist +8 m Design verification and site walk-through →Pre-construction: design verification and site walk-through
- 18:48, 28 July 2022 diff hist +54 m Construction: communication, inspection plan, and utilities coordination →Pre-construction: communication, inspection plan, and utilities coordination
- 17:52, 28 July 2022 diff hist −22 m Construction: communication, inspection plan, and utilities coordination →Pre-construction: communication, inspection plan, and utilities coordination
- 17:46, 28 July 2022 diff hist +1 m Design verification and site walk-through
- 17:45, 28 July 2022 diff hist −9 m Design verification and site walk-through →Pre-construction: design verification and site walk-through
- 17:42, 28 July 2022 diff hist +3 m Construction: excavation and rough grade →Excavation and mass grading: excavation
- 16:02, 28 July 2022 diff hist −3 m Construction: excavation and rough grade →Excavation and mass grading: excavation
- 15:01, 22 July 2022 diff hist +482 m Construction: communication, inspection plan, and utilities coordination →Pre-construction: communication, inspection plan, and utilities coordination
- 14:59, 22 July 2022 diff hist −388 m Construction: tendering and contract →Pre-construction: tendering and contract
- 14:55, 22 July 2022 diff hist +70 m Construction: erosion and sediment control measures →Pre-construction: erosion and sediment control measures
- 14:54, 22 July 2022 diff hist 0 N File:P1090179 SlingerTruck.JPG current
- 19:28, 21 July 2022 diff hist +18 m Construction: communication, inspection plan, and utilities coordination →Communication, inspection plan, and utilities coordination
- 19:27, 21 July 2022 diff hist +18 m Construction: mobilization, access, staging, and perimeter controls →Mobilization, access, staging, and perimeter controls
- 19:26, 21 July 2022 diff hist +1 m Construction: tendering and contract →Preconstruction: tendering and contract
- 19:26, 21 July 2022 diff hist +1 m LID construction notes →Preconstruction: LID construction notes
- 19:26, 21 July 2022 diff hist +1 m Design verification and site walk-through →Preconstruction: design verification and site walk-through
- 19:25, 21 July 2022 diff hist +19 m Construction: erosion and sediment control measures →Erosion and sediment control measures
- 18:56, 21 July 2022 diff hist 0 m Bioretention: Construction →Excavation and Mass Grading (KM)
- 18:44, 21 July 2022 diff hist +16 m Construction: tendering and contract →Tendering and contract
- 18:43, 21 July 2022 diff hist +17 m LID construction notes →LID construction notes
- 18:41, 21 July 2022 diff hist −151 m Bioretention: Construction →Pre-Construction