Changes

Jump to navigation Jump to search
Line 43: Line 43:
:The maximum width of a facility is determined by the reach of the construction machinery, which must not be tracked into the cell.
:The maximum width of a facility is determined by the reach of the construction machinery, which must not be tracked into the cell.
*Setback from buildings: A typical four (4) metre setback is recommended from building foundations. If an impermeable liner is used, no setback is needed.
*Setback from buildings: A typical four (4) metre setback is recommended from building foundations. If an impermeable liner is used, no setback is needed.
*Proximity to Underground utilities and overhead wires: Consult with local utility companies regarding horizontal and vertical clearance required between storm drains, ditches, and surface water bodies.  Further, check whether the future tree canopy height in the bioretention area will not interfere with existing overhead wires.
*Proximity to underground utilities and overhead wires: Consult with local utility companies regarding horizontal and vertical clearance required between storm drains, ditches, and surface water bodies.  Further, check whether the future tree canopy height in the bioretention area will not interfere with existing overhead wires.
The principles of bioretention can be applied in any scenario where planting or vegetation would normally be found.
The principles of bioretention can be applied in any scenario where planting or vegetation would normally be found.


Navigation menu