The feasibility of storing the channel erosion control volume within bioretention areas will be dependent on the size of the drainage area and available space. It may prove infeasible due to the large footprint needed to maintain the recommended maximum ponding depth of 200 mm. Meeting the channel erosion control requirement through bioretention is most feasible in the regions of the Greater Toronto Area with [[A and B soils|Soil groups]]. In these situations, the reduction in runoff volume through infiltration and evapotranspiration may be sufficient. It is important to note that the bioretention practice will infiltrate runoff throughout the course of the storm; so the actual capacity of the bioretention cell to capture runoff from the drainage area will be larger than its designed storage volume.