Changes

Jump to navigation Jump to search
Line 91: Line 91:
'''Stone Choker  Layer'''<br>                       
'''Stone Choker  Layer'''<br>                       
'''Curbing'''<br>     
'''Curbing'''<br>     
It is very important to make sure that the contractor responsible for curb construction understands curb cut designs and elevations. This is often a new technique for contractors and they may not understand the overall concept of water in the gutter line being directed behind the gutter.  
It is very important to make sure that the contractor responsible for curb construction understands curb cut designs and elevations. This is often a new technique for contractors and they may not understand the overall concept of water in the gutter line being directed behind the gutter. <br>
Common mistakes to avoid:
Common mistakes to avoid:
* Elevated curb cuts and reverse slopes (sloping from back of curb towards instead of depressing from gutter line towards the back)
* Elevated curb cuts and reverse slopes (sloping from back of curb towards instead of depressing from gutter line towards the back)

Navigation menu