Changes

Jump to navigation Jump to search
Line 96: Line 96:
* Curb cut size (width)
* Curb cut size (width)
* Placement of curb cuts on steep slopes or the down slope side of a catchbasin                                               
* Placement of curb cuts on steep slopes or the down slope side of a catchbasin                                               
'''Pre-treatment and Inlet'''<br>                  
'''Pre-treatment and Inlet'''<br>    
Pre-treatment structures are most cost effective when they slow down incoming flows, collect sediment for easy clean out, and release water to the bioretention facility in a non-erosive way. <br>             
'''Soil Media / Filter Media'''<br>
'''Soil Media / Filter Media'''<br>


Navigation menu