Ideally, inspections should be continuous as the work progresses. If this isn’t possible, critical inspection points are:
The STEP LID Stormwater Management Inspection and Maintenance Guide gives detailed guidance on how to conduct construction inspections for LID practices. Generally, construction inspections should be continuous as the work progresses. If this isn’t possible, critical inspection points are: