Changes

Jump to navigation Jump to search
Line 292: Line 292:
*Plow snow as needed and spread deicers sparingly during winter;
*Plow snow as needed and spread deicers sparingly during winter;
*Repair ruts or local sinking of 15 mm or greater over a 3 metre length, adjacent pavers or cracks in pervious concrete or porous asphalt are vertically offset by 5 mm or greater and paver joint fill is missing or below 15 mm from the paver surface.
*Repair ruts or local sinking of 15 mm or greater over a 3 metre length, adjacent pavers or cracks in pervious concrete or porous asphalt are vertically offset by 5 mm or greater and paver joint fill is missing or below 15 mm from the paver surface.
|[[File:Pass.PNG|300px|thumb|center|CDA has not changed in size or land cover. Sediment, trash or debris is not accumulating and point sources of contaminants are not visible.]]  
|[[File:Pavesurface Pass p.p.JPG|300px|thumb|center|No damage, displacement or sinking of the permeable surface is visible and there are no weeds growing between paver joints.]]  
|[[File:Fail bio.PNG|280px|thumb|center|Size of the CDA has changed from design assumptions. A point source for contaminants is visible (i.e. lack of sediment controls on adjacent construction site). (Photo Source: North Carolina Cooperative Extension)]]
|[[File:Fail bio.PNG|280px|thumb|center|Size of the CDA has changed from design assumptions. A point source for contaminants is visible (i.e. lack of sediment controls on adjacent construction site). (Photo Source: North Carolina Cooperative Extension)]]
|-
|-

Navigation menu