| [[Overflow|Overflows]] are features of inline facilities and convey larger storm events out of the LID feature.<br> | | ====Overflows==== |
| | [[Overflow|Overflows]] are features of inline facilities and convey larger storm events out of the LID feature. |
|
| |
|
| '''Construction Steps:'''<br> | | '''Construction Steps:''' |
| #Connect the overflow drain to the underdrain. | | #Connect the overflow drain to the underdrain. |
| #Install overflow pit to grade at the location specified in the contract documents. | | #Install overflow pit to grade at the location specified in the contract documents. |
| #Fit a metal, domed grate to the overflow.<br> | | #Fit a metal, domed grate to the overflow. |
|
| |
|
| '''Key Inspection Points:'''<br> | | '''Key Inspection Points:''' |
| *Overflow drain matches design specifications. | | *Overflow drain matches design specifications. |
| *Overflow pit is positioned at the maximum water surface elevation of the practice, as per the contract documents. | | *Overflow pit is positioned at the maximum water surface elevation of the practice, as per the contract documents. |
| *Sufficient freeboard is provided between the overflow and inlet such that the inlet is not inundated by design storm flows. | | *Sufficient freeboard is provided between the overflow and inlet such that the inlet is not inundated by design storm flows. |
| *Overflow grate matches design specifications. | | *Overflow grate matches design specifications. |
| *Overflow grates located in high-traffic areas are screwed on or equipped with locks.<br> | | *Overflow grates located in high-traffic areas are screwed on or equipped with locks. |
|
| |
|
| '''Mistakes to Avoid:'''<br> | | '''Mistakes to Avoid:''' |
| *Backflows – ensure that backflows are avoided by confirming that inlet and overflow elevations match design specifications with surveys. | | *Backflows – ensure that backflows are avoided by confirming that inlet and overflow elevations match design specifications with surveys. |
| *Incorrect sequencing – install overflow drain prior to backfilling with granular material and engineered soil. | | *Incorrect sequencing – install overflow drain prior to backfilling with granular material and engineered soil. |
| *Incorrect grate material – avoid using plastic overflow grates due to breakages and UV degradation.<br> | | *Incorrect grate material – avoid using plastic overflow grates due to breakages and UV degradation. |
|
| |
|
| <gallery mode="packed" widths=300px heights=300px> | | <gallery mode="packed" widths=300px heights=300px> |