| Establish required perimeter controls, including erosion and sediment control (ESC) measures, prior to construction and adjust accordingly during construction. ESC measures come in two basic types: structural ESC, which slows and holds runoff from the disturbed area, dissipating erosive forces, promoting ponding, and allowing suspended particles to settle out; and non-structural ESC, which primarily minimizes the exposure time of stripped soils. STEP’s Erosion and Sediment Control Guide contains detailed guidance on the design, installation, inspection, maintenance, and decommissioning of ESC measures. | | Establish required perimeter controls, including erosion and sediment control (ESC) measures, prior to construction and adjust accordingly during construction. ESC measures come in two basic types: structural ESC, which slows and holds runoff from the disturbed area, dissipating erosive forces, promoting ponding, and allowing suspended particles to settle out; and non-structural ESC, which primarily minimizes the exposure time of stripped soils. STEP’s [https://sustainabletechnologies.ca/app/uploads/2020/01/ESC-Guide-for-Urban-Construction_FINAL.pdf Erosion and Sediment Control Guide] contains detailed guidance on the design, installation, inspection, maintenance, and decommissioning of ESC measures. This section gives simple, practical advice on structural and non-structural ESC for contractors, inspectors, and those who are new to construction and ESC practices. |
| For non-structual ESC measures, be sure to: | | For non-structual ESC measures, be sure to: |
| *Stage clearing and grubbing to minimize exposure of stripped soils. | | *Stage clearing and grubbing to minimize exposure of stripped soils. |
Line 8: |
Line 8: |
| Generally, all exposed soils that are not being actively worked on must have temporary erosion protection or permanent cover within 7 days for slopes 3:1 or greater and 14 days for slopes 3:1 or lesser and 14 days for slopes 3:1 or flatter. This should apply to all exposed soil areas year-round and until the site is stabilized. <br> | | Generally, all exposed soils that are not being actively worked on must have temporary erosion protection or permanent cover within 7 days for slopes 3:1 or greater and 14 days for slopes 3:1 or lesser and 14 days for slopes 3:1 or flatter. This should apply to all exposed soil areas year-round and until the site is stabilized. <br> |
|
| |
|
| The table below gives practical advice on installing structural ESC measures for contractors, inspectors, and those who are new to construction and ESC practices. | | The table below gives guidance on common mistakes made when installing structural ESC measures. |
|
| |
|
|
| |
|
Line 22: |
Line 22: |
| |'''Sediment fencing''' | | |'''Sediment fencing''' |
| | | | | |
| Stake it in, support it, and double it up adjacent to natural heritage features. | | *Stake it in, support it, and double it up adjacent to natural heritage features. |
| | | | | |
| Leave vulnerable areas with insufficient supports. | | *Leave vulnerable points with insufficient supports. |
| |[[File:Pass.PNG|300px|thumb|center|CDA has not changed in size or land cover. Sediment, trash or debris is not accumulating and point sources of contaminants are not visible.]] | | |[[File:ESC doubled up.png|300px|thumb|center|This sedidment fencing has been doubled up and staked in. As a result, it kept a large amount of sediment from entering the adjacent natural heritage feature. It is in need of immediate maintenance, however.]] |
| |[[File:ESC insufficient support.JPG|280px|thumb|center|This sediment fencing was not staked in at the likely point of failure, resulting in the release of sediment into an adjacent natural heritage feature. (Photo Source: North Carolina Cooperative Extension)]] | | |[[File:ESC insufficient support.JPG|300px|thumb|center|This sediment fencing was not staked in at the likely point of failure, resulting in the release of sediment into an adjacent natural heritage feature. (Photo Source: CISEC)]] |
| | |- |
| | |'''Inlet controls''' |
| | | |
| | *Support and stake in inlet controls such as sediment socks. |
| | *Use catch basin inserts as a final line of protection. |
| | | |
| | *Leave inlets to the stormwater management system unprotected or unsupported |
| | | |
| | Test |
| | | |
| | Test |
| | |- |
| | |'''Stockpiles''' |
| | | |
| | *Sling soil and aggregates into the facility when possible. |
| | *Install soil and aggregates upon arrival to the site when possible. |
| | | |
| | *Store materials within the stormwater management system, e.g., in the roadway. |
| | *Leave stockpiles unprotected when wet weather is expected |
| | |test |
| | |test |
| | |- |
| | |'''Filter fabric''' |
| | | |
| | *Use sacrificial filter fabric when necessary |
| | | |
| | *Allow sediment to enter the LID footprint |
| | |test |
| | |test |
| | |
| | |
| |} | | |} |