[[File:Stockpile in gutter.jpg|300px|thumb|center|If it were to rain, fines from this stockpile would go straight into the downstream catchbasin. (Photo source: CVC)]]
[[File:Stockpile in gutter.jpg|300px|thumb|center|If it were to rain, fines from this stockpile would go straight into the downstream catchbasin. (Photo source: CVC)]]
|-
|-
|'''Filter fabric'''
|'''Protecting features during construction, including using sacrificial filter fabric'''
|
|
*Use sacrificial filter fabric when necessary to protect features, and leave ESC measures in place until all construction in the LID's drainage area is complete.
*Use sacrificial filter fabric when necessary to protect features, and leave ESC measures in place until all construction in the LID's drainage area is complete.
|
|
*Remove ESC measures early or allow sediment to enter the LID footprint
*Remove ESC measures early or allow sediment to enter the LID footprint.
|
|
[[File:ESC sacrificial fabric.png|300px|thumb|center|]]