Line 1: |
Line 1: |
| ==Erosion and sediment control measures== | | ==Erosion and sediment control measures== |
| | [[File:ESC perpendicular grooves.jpg|400px|thumb|right|Perpendicular grooves perpendicular to the grade help prevent the development of rills.]] |
| | Establish required perimeter controls, including erosion and sediment control (ESC) measures, prior to construction and adjust accordingly during construction. ESC measures come in two basic types: structural ESC, which slows and holds runoff from the disturbed area, dissipating erosive forces, promoting ponding, and allowing suspended particles to settle out; and non-structural ESC, which primarily minimizes the exposure time of stripped soils. STEP’s [https://sustainabletechnologies.ca/app/uploads/2020/01/ESC-Guide-for-Urban-Construction_FINAL.pdf Erosion and Sediment Control Guide] contains detailed guidance on the design, installation, inspection, maintenance, and decommissioning of ESC measures. This section gives simple, practical advice on structural and non-structural ESC for contractors, inspectors, and those who are new to construction and ESC practices. |
|
| |
|
| Establish required perimeter controls, including erosion and sediment control (ESC) measures, prior to construction and adjust accordingly during construction. ESC measures come in two basic types: structural ESC, which slows and holds runoff from the disturbed area, dissipating erosive forces, promoting ponding, and allowing suspended particles to settle out; and non-structural ESC, which primarily minimizes the exposure time of stripped soils. STEP’s [https://sustainabletechnologies.ca/app/uploads/2020/01/ESC-Guide-for-Urban-Construction_FINAL.pdf Erosion and Sediment Control Guide] contains detailed guidance on the design, installation, inspection, maintenance, and decommissioning of ESC measures. This section gives simple, practical advice on structural and non-structural ESC for contractors, inspectors, and those who are new to construction and ESC practices.
| |
| [[File:ESC perpendicular grooves.jpg|400px|thumb|right|Perpendicular grooves perpendicular to the grade help prevent the development of rills.]]
| |
| For non-structual ESC measures, be sure to: | | For non-structual ESC measures, be sure to: |
| *Stage clearing and grubbing to minimize exposure of stripped soils. | | *Stage clearing and grubbing to minimize exposure of stripped soils. |