#Use appropriately sized machinery (e.g. a mini-excavator) to strip sod and ground-level vegetation (clearing).
#Use appropriately sized machinery (e.g. a mini-excavator) to strip sod and ground-level vegetation (clearing).
#Stockpile materials within designated areas if necessary. If the materials are being hauled offsite, stripped materials ideally would go straight into the back of a dump truck.
#Stockpile materials within designated areas if necessary. If the materials are being hauled offsite, stripped materials ideally would go straight into the back of a dump truck.
#Secure stockpiles with appropriate ESC measures if the material must be stored before hauling offsite or will be reused.
#Secure stockpiles with appropriate erosion and sediment control (ESC) measures if the material must be stored before hauling offsite or will be reused.
'''Key inspection points'''
'''Key inspection points'''
*Structural ESC measures are in place before clearing and grubbing begin.
*Structural ESC measures are in place before clearing and grubbing begin.