Changes

Jump to navigation Jump to search
m
no edit summary
Line 11: Line 11:
*Contractor cleared and grubbed only within designated areas and according to the phasing plan.
*Contractor cleared and grubbed only within designated areas and according to the phasing plan.
'''Mistakes to avoid'''
'''Mistakes to avoid'''
*Clearing more area than is needed  
*clearing more area than is needed  
*Insufficient marking of areas to be protected
*insufficient marking of areas to be protected
*Stockpiling materials without ESC controls or for extended periods of time
*stockpiling materials without ESC controls or for extended periods of time
*Leaving heavy equipment in the facility’s footprint
*leaving heavy equipment in the facility’s footprint
*Making excessive passes with heavy equipment in the LID practice’s footprint without scouring soil afterward
*making excessive passes with heavy equipment in the LID practice’s footprint without scouring soil afterward
722

edits

Navigation menu