Changes

Jump to navigation Jump to search
Line 229: Line 229:
20170605_164302.jpg | Components of an infiltration chamber being overlapped.
20170605_164302.jpg | Components of an infiltration chamber being overlapped.
East_Gwillimbury.png | Example of "crate style" Infiltration chambers being installed in East Gwillimbury. Photo credit: Make-Way Environmental Technologies Inc.
East_Gwillimbury.png | Example of "crate style" Infiltration chambers being installed in East Gwillimbury. Photo credit: Make-Way Environmental Technologies Inc.
ADS-manifold.JPG | Manifold connecting to infiltration chamber rows. Photo provided by Advanced Drainage Systems.
ADS-manifold.jpg | Manifold connecting to infiltration chamber rows. Photo provided by Advanced Drainage Systems.
Scour-fabric.JPG | Scour fabric rolled out below an infiltration chamber during assembly. Photo provided by Advanced Drainage Systems.
Scour-fabric.jpg | Scour fabric rolled out below an infiltration chamber during assembly. Photo provided by Advanced Drainage Systems.
Alton-Envirohood.jpg | A storm chamber inlet protected from debride by an envirohood. It is essential that the top of the chamber is lower in elevation than any other outlets from the catchbasin. This is because the chamber’s capacity should be fully utilized before runoff is allowed to travel farther downstream.
Alton-Envirohood.jpg | A storm chamber inlet protected from debride by an envirohood. It is essential that the top of the chamber is lower in elevation than any other outlets from the catchbasin. This is because the chamber’s capacity should be fully utilized before runoff is allowed to travel farther downstream.
Chamber-excavator.jpg | An excavator covering units of unfinished infiltration chamber rows with perimeter stone. Stone can be applied progressively as the rows are completed to ensure that space is provided for the excavator to work within the LID footprint. Photo provided by Municipal Sewer & Water.


</gallery>
</gallery>
426

edits

Navigation menu