| The [[construction]] guidance in this section applies to all sub-surface and ground-level LID practices: [[bioretention|bioretention gardens]], [[bioswales]], [[rain gardens]], [[exfiltration trenches]], [[enhanced swales]], [[permeable pavements]], [[infiltration trenches]], [[infiltration chambers]], and [[soakaways]]. In general, this section describes construction processes for below ground installed materials and infrastructure that are part of the LID practices noted above. | | The [[construction]] guidance in this section applies to all sub-surface and ground-level LID practices: [[bioretention|bioretention gardens]], [[bioswales]], [[rain gardens]], [[exfiltration trenches]], [[enhanced swales]], [[permeable pavements]], [[infiltration trenches]], [[infiltration chambers]], and [[soakaways]]. In general, this section describes construction and inspection processes for below ground installed materials and infrastructure that are part of the LID practices noted above. |