=Key inspection points=
=Key inspection points=
Construction inspections take place during several points in the construction sequence, specific to the type of LID BMP, but at a minimum should be done weekly and include the following:  
Construction inspections take place during several points in the construction sequence, specific to the type of LID BMP, but at a minimum should be done weekly and include the following:  
Line 90: Line 91:
#Do not install vegetated mats with limited plant coverage. Mats should have a minimal plant coverage of 80 %  
#Do not install vegetated mats with limited plant coverage. Mats should have a minimal plant coverage of 80 %  
#Test and ensure green roof irrigation systems functions properly
#Test and ensure green roof irrigation systems functions properly
[[file:GRMatstorage.JPG|400px|thumb|right|Storage of green roof materials (Photo Source: CVC)]]