Line 46:
Line 46:
==Large stone and riprap==
==Large stone and riprap==
{{:Construction: large stone and riprap}}
Riprap serves as a protective layer to: prevent sediment entering the underlying layers and clogging the LID facility, dissipate stormwater energy, and stabilize the terrain and slope.
Riprap serves as a protective layer to: prevent sediment entering the underlying layers and clogging the LID facility, dissipate stormwater energy, and stabilize the terrain and slope.
Line 60:
Line 60:
*Use of wrong material that does not meet design specifications. If there are changes in the material, it must be approved by the supervisor or project manager.<br>
*Use of wrong material that does not meet design specifications. If there are changes in the material, it must be approved by the supervisor or project manager.<br>
{{:riprap: Gallery}}
{{:riprap: Gallery}}
==Plant material verification and installation==
==Plant material verification and installation==
{{:Construction: plant material verification and installation}}
{{:Construction: plant material verification and installation}}