Changes

Jump to navigation Jump to search
m
Line 125: Line 125:
and towards waterways. Opportunities for P2 include locating
and towards waterways. Opportunities for P2 include locating
dumpsters on a flat concrete surface that does not slope
dumpsters on a flat concrete surface that does not slope
or drain to the storm drain system, installing a secondary
or drain to the storm drain system, installing a secondary containment
system such as a berm or curb around the dumpster, and closing and securing
lids properly when the dumpster is not being loaded or unloaded.
 
Education is a critical component in the implementation of pollution prevention measures.
Training your employees on both P2 procedures as well as the reasons behind them can change
attitudes toward pollution prevention. Employees may be more diligent in following P2
practices if they understand how it effects the quality of their drinking water.
722

edits

Navigation menu