Changes
Jump to navigation
Jump to search
← Older edit
Newer edit →
Pollution prevention
(view source)
Revision as of 19:16, 18 December 2017
505 bytes added
,
6 years ago
m
→Dumpster management
Line 125:
Line 125:
and towards waterways. Opportunities for P2 include locating
and towards waterways. Opportunities for P2 include locating
dumpsters on a flat concrete surface that does not slope
dumpsters on a flat concrete surface that does not slope
or drain to the storm drain system, installing a secondary
or drain to the storm drain system, installing a secondary
containment
system such as a berm or curb around the dumpster, and closing and securing
lids properly when the dumpster is not being loaded or unloaded.
Education is a critical component in the implementation of pollution prevention measures.
Training your employees on both P2 procedures as well as the reasons behind them can change
attitudes toward pollution prevention. Employees may be more diligent in following P2
practices if they understand how it effects the quality of their drinking water.
Kyle menken
722
edits
Navigation menu
Personal tools
English
Log in
Namespaces
Page
Discussion
Variants
expanded
collapsed
Views
Read
View source
View history
More
expanded
collapsed
Search
Navigation
Home
Table of contents
All pages
Recent changes
Responses to comments
Tools
Special pages
Printable version