Changes

Jump to navigation Jump to search
m
Line 79: Line 79:
|Permeable pavement<ref name = "IMAX"/>||3 years||Silty clay fill over clay till||1:1||0.025||49
|Permeable pavement<ref name = "IMAX"/>||3 years||Silty clay fill over clay till||1:1||0.025||49
|}
|}
<nowiki>*</nowiki>Represents depth of sump below underdrain or outflow pipe.  In some cases, a flow control device was installed to slow outflow rates and enhance infiltration
<nowiki>*</nowiki>Represents depth of sump below [[underdrain]] or [[overflow]] pipe.  In some cases, a [[flow control]] device was installed to slow outflow rates and enhance infiltration


----
----

Navigation menu