Difference between revisions of "LID Construction"
Jump to navigation
Jump to search
Line 31: | Line 31: | ||
{{Clickable button|[[Stormwater Planters: Construction]]}} | {{Clickable button|[[Stormwater Planters: Construction]]}} | ||
=LID Pages= | |||
*[[Bioretention]] | |||
*[[Bioswales]] | |||
*[[Blue roofs]] | |||
*[[Enhanced swales]] | |||
*[[Exfiltration trenches]] | |||
*[[Green roofs]] | |||
*[[Infiltration chambers]] | |||
*[[Infiltration trenches]] | |||
*[[Permeable pavements]] | |||
*[[Rain gardens]] | |||
*[[Stormwater planters]] | |||
*[[Stormwater Tree Trenches]] | |||
*[[Swales]] | |||
*[[Vegetated filter strips]] |
Revision as of 19:45, 11 February 2022
Why is construction different?[edit]
Why problems occur?[edit]
Phases of LID Construction[edit]
1. Pre-Construction:
- Verification of design
- Tendering and contract
- Pre-construction inspection and protocols
- Mobilizing, access and perimeter controls
- Erosion and Sediment Control (ESC)
2. Construction:
- Excavation and mass grading
- Backfill granular and pipes
- Finish grades: inlet, outlet, biomedia and plants
3. Post-Construction:
- Address deficiencies
- Assumption protocols
Why is inspection important for LID Construction?[edit]
Construction Guidance[edit]