All public logs
Jump to navigation
Jump to search
Combined display of all available logs of LID SWM Planning and Design Guide. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)- 18:28, 30 September 2022 SamanthaPelayo talk contribs created page File:P1000154.JPG
- 18:28, 30 September 2022 SamanthaPelayo talk contribs uploaded File:P1000154.JPG
- 22:02, 22 September 2022 SamanthaPelayo talk contribs created page Trench, chamber, and perforated pipe: Installation (Created page with "The guidance provided in this section is applicable for the construction of soakaway pits, infiltration chambers, infiltration trenches, and exfiltration pipes of varying size and shape, since the installation of each of these features is similar. File:Chamber-excavator.jpg|400px|thumb|right|An excavator covering units of unfinished infiltration chamber rows with perimeter stone. Stone can be applied progressively as the rows are completed to ensure that space is prov...")
- 21:59, 22 September 2022 SamanthaPelayo talk contribs created page Permeable pavement sub-base and base course (Created page with "Because permeable pavements may be required to support heavy loads (driveways, laneways, etc.), the sub-base and base course may require compaction to prevent heaving and shifting. ===Sub-base reservoir=== In permeable pavement systems, the sub-base is the layer of granular material that is laid on the sub-grade. The granular sub-base should be clear, crushed 50 mm stone. See the Permeable pavements: Specifications page for detailed sub-base material specifications. Th...")
- 14:29, 22 September 2022 SamanthaPelayo talk contribs created page Joint aggregate (Created page with "The joint aggregate is an important component of Permeable Interlocking Concrete Pavement (PICP) installations, as it allows for water falling on the surface to infiltrate into the underlying layers (bedding and filter layer, base course, and sub-base reservoir). '''Construction Steps:''' #Ensure paver pattern and joint width match drawing details. #Fill in the openings and joints with ASTM No. 8 stone ( mm)* using tools such as a brush or a broom. #Sweep the pavers to...")
- 14:20, 22 September 2022 SamanthaPelayo talk contribs created page Joint cutting (Created page with "400px|thumb|right| Cutting joints with a "pizza cutter". (Concrete Network, 2022)<ref> Concrete Network. 2022. Permeable Concrete Pavements. Photo. Accessed August 13 2022. https://www.concretenetwork.com/pervious/ </ref> Pavement joints are important in permeable concrete systems to prevent the pavement being cracked and moved. These potential problems are caused by water, ice, salt and loads on the pavement surface. '''Construction Steps:'...")
- 14:07, 22 September 2022 SamanthaPelayo talk contribs created page Tamping (Created page with "Tamping is an important construction step when installing permeable pavements systems. Tamping allows for the permeable surface (concrete or pavers) to set and adhere to the bedding layer beneath. Tamping also allows for flattening or evening out the surface, resulting in visually appealing finish. '''Construction Steps:''' #Remove any pieces that have imperfections on the surface. #Place the tamper onto the pavement surface. #Pass the tamper across all the pavement are...")
- 19:39, 17 August 2022 SamanthaPelayo talk contribs created page File:P1120709.JPG
- 19:39, 17 August 2022 SamanthaPelayo talk contribs uploaded File:P1120709.JPG
- 19:37, 17 August 2022 SamanthaPelayo talk contribs created page File:P1150948.JPG
- 19:37, 17 August 2022 SamanthaPelayo talk contribs uploaded File:P1150948.JPG
- 19:06, 17 August 2022 SamanthaPelayo talk contribs created page Template:Construction: stabilizing contributing drainage area (Created page with "{{:Construction: stabilizing contributing drainage area}}")
- 18:49, 17 August 2022 SamanthaPelayo talk contribs created page File:JointCutting2.jpg
- 18:49, 17 August 2022 SamanthaPelayo talk contribs uploaded File:JointCutting2.jpg
- 18:49, 17 August 2022 SamanthaPelayo talk contribs created page File:JointCutting1.jpg
- 18:49, 17 August 2022 SamanthaPelayo talk contribs uploaded File:JointCutting1.jpg
- 18:23, 17 August 2022 SamanthaPelayo talk contribs created page File:IMG 3313.JPG
- 18:23, 17 August 2022 SamanthaPelayo talk contribs uploaded File:IMG 3313.JPG
- 18:07, 17 August 2022 SamanthaPelayo talk contribs created page File:Tamping.jpg
- 18:07, 17 August 2022 SamanthaPelayo talk contribs uploaded File:Tamping.jpg
- 13:18, 27 July 2022 SamanthaPelayo talk contribs created page Construction: tamping (Created blank page)
- 13:18, 27 July 2022 SamanthaPelayo talk contribs created page Construction: joint aggregate (Created blank page)
- 13:17, 27 July 2022 SamanthaPelayo talk contribs created page Construction: joint cutting (Created blank page)
- 13:48, 22 July 2022 SamanthaPelayo talk contribs created page File:P1160129.JPG
- 13:48, 22 July 2022 SamanthaPelayo talk contribs uploaded File:P1160129.JPG
- 18:58, 21 July 2022 SamanthaPelayo talk contribs created page Permeable pavements: Construction (Created page with "Add here your content!!")
- 16:18, 21 July 2022 SamanthaPelayo talk contribs created page Construction: stabilizing contributing drainage area (Created page with "150px|thumb|right|Natural lawn grass installed to stabilize the contributing drainage area at the Glendale P.S. rain garden in Brampton, Ontario. Similar to the plant material verification and installation task shown above, any planting required to stabilize the contributing drainage area will need to meet the specifications and considerations shown above.<br> Additionally, if turf/grass is required to stabilize the contributing drainage area, in...")
- 16:18, 21 July 2022 SamanthaPelayo talk contribs created page Construction: mulch placement (Created page with "Wood mulch provides numerous functions to a bioretention practice including reducing soil erosion, filtration, protecting underlying soils from compaction, retaining moisture, and minimizing volunteer weed establishment. Communicate to contractor how to install and the mulch type in the plans and or specifications with notes, details, spot elevations, and other special features needed as per designed. Equipment recommended for this task can be: *Automated: Mulch blowers...")
- 16:17, 21 July 2022 SamanthaPelayo talk contribs created page Construction: plant material verification and installation (Created page with "thumb|right|CVC staff planting plant material at Our Lady of Fatima Catholic School in Brampton, Ontario. A healthy and vibrant vegetation structure provides itself with nutrients to sustain growth. Additionally, it holds, and retains water and oxygen, and binds and degrades pollutants. When selecting plants, consider the following: *Native species need fewer inputs and are better adapted to local climate and soils. *Larger plant stock should...")
- 16:15, 21 July 2022 SamanthaPelayo talk contribs created page Construction: large stone and riprap (Created page with "Riprap serves as a protective layer to: prevent sediment entering the underlying layers and clogging the LID facility, dissipate stormwater energy, and stabilize the terrain and slope. '''Construction Steps:''' #Backfill the material from the outside of the LID facility to avoid compaction. #Ensure the material is being placed to the elevation and thickness to the design requirements. '''Key Inspection Points:''' *Arrival of material to the site: material meets specif...")
- 16:14, 21 July 2022 SamanthaPelayo talk contribs created page Construction: finish grading (Created page with "The finish grading process is another critical handoff moment as a number of elements such as curbs, sidewalks, soils and vegetation start to come together to create the functional and aesthetic value of a site. The same supervision and communication that was put into controlling ESC in earlier stages is also required during finish grading. In many cases, more attention to detail is needed for elements in this phase that will create or not the success of the final produc...")
- 16:12, 21 July 2022 SamanthaPelayo talk contribs created page Construction: soil media and amendment (Created page with "Bioretention can be constructed over any soil type, but hydrologic soil group A and B are best for achieving water balance objectives. Facilities designed to infiltrate water should be located on portions of the site with the highest infiltration rates. STEP has detailed construction guidance on soil amendments available on its https://sustainabletechnologies.ca/home/urban-runoff-green-infrastructure/healthy-soils/construction-specifications-for-implementing-compost-am...")
- 16:09, 21 July 2022 SamanthaPelayo talk contribs created page Construction: pretreatment and inlet (Created page with "Pre-treatment structures are most cost effective when they slow down incoming flows, collect sediment for easy clean out, and slowly release water to the bioretention facility mitigating erosion. Pretreatment structures/strategies can include curb cuts, Aggregates, proprietary devices like filters or hydrodynamic separators, vegetation, concrete sumps, membrane filters, overland flow sumps, etc. '''Construction Steps:''' *Installation of pre-treatment fea...")
- 16:07, 21 July 2022 SamanthaPelayo talk contribs created page Construction: curbing (Created page with ""'INSERT VIDEO FROM HAGGERT AVE: \\Hqcvcfs01\cvc2\Watershed Management\Integrated Water Management Implementation\Fletchers Creek SNAP\Haggert Ave Road Retrofit\3 - Photos\Construction Photos\Site Visit_20201120\Riverstone Construction Haggert Ave Inlet_F.mp4'' It is very important to make sure that the contractor responsible for curb construction understands curb cut designs and elevations. This is often a new technique for contractors, and they may not understand...")
- 16:05, 21 July 2022 SamanthaPelayo talk contribs created page Construction: stone choker layer (Created page with "''INSERT VIDEO: K:\Watershed Management\Integrated Water Management Implementation\Fletchers Creek SNAP\Haggert Ave Road Retrofit\3 - Photos\Construction Overview Presentation\Video--> HaggertAve_Final.MP4'' In LID facilities, a choker layer of ≥ 100 mm depth is recommended to prevent migration of finer filter media into the underlying storage reservoir aggregate. Similar to the storage reservoir material, this aggregate layer should be a washed 5 – 10 mm stone not...")
- 16:02, 21 July 2022 SamanthaPelayo talk contribs created page Construction: storage reservoir (Created page with "''INSERT YOUTUBE LINK: https://www.youtube.com/watch?v=Ng_s2ErvPqk&t=58s <br>'' The storage reservoir layer holds and directs the stormwater into the underlying/native soils. The LID facilities, if applicable, should be filled with uniformly graded, washed stone (20 mm – 50 mm) that provides 30 to 40% void space. ‘’’Construction steps:’’’ #Backfill material from outside of the LID facility to avoid compaction and sediment entering the facilities. Use a s...")
- 21:10, 18 July 2022 SamanthaPelayo talk contribs created page File:20150618 114542.jpg
- 21:10, 18 July 2022 SamanthaPelayo talk contribs uploaded File:20150618 114542.jpg
- 20:36, 18 July 2022 SamanthaPelayo talk contribs created page File:IMG 0897.JPG
- 20:36, 18 July 2022 SamanthaPelayo talk contribs uploaded File:IMG 0897.JPG
- 20:35, 18 July 2022 SamanthaPelayo talk contribs created page File:IMG 0891.JPG
- 20:35, 18 July 2022 SamanthaPelayo talk contribs uploaded File:IMG 0891.JPG
- 20:34, 18 July 2022 SamanthaPelayo talk contribs created page File:IMG 0788-1.JPG
- 20:34, 18 July 2022 SamanthaPelayo talk contribs uploaded File:IMG 0788-1.JPG
- 20:34, 18 July 2022 SamanthaPelayo talk contribs created page File:IMG 0744.JPG
- 20:34, 18 July 2022 SamanthaPelayo talk contribs uploaded File:IMG 0744.JPG
- 19:33, 18 July 2022 SamanthaPelayo talk contribs created page Riprap: Gallery (Created page with "<gallery mode="packed" widths=200px heights=200px> Riprap directing the flow from the curb cut into a bioswale in Brampton, ON. Riprap directing the flow from the log flume into a rain garden at Belfountain P.S., Belfountain, ON. Riprap conveying the flow from the adjacent field into a rain garden at Janet I. McDougald P.S., Mississauga, ON. </gallery> Category:Gallery")
- 19:15, 18 July 2022 SamanthaPelayo talk contribs created page File:OLF Rain Garden.jpg
- 19:15, 18 July 2022 SamanthaPelayo talk contribs uploaded File:OLF Rain Garden.jpg
- 15:49, 18 July 2022 SamanthaPelayo talk contribs created page File:IMG 0852-1.JPG