User contributions
19 July 2022
Construction: communication, inspection plan, and utilities coordination
no edit summary
m−27
Bioretention: Construction
Pre-Construction (KM)
m+11
Construction: communication, inspection plan, and utilities coordination
no edit summary
m+8
Construction: communication, inspection plan, and utilities coordination
no edit summary
m+34
Construction: communication, inspection plan, and utilities coordination
no edit summary
m+3,658
Construction: communication, inspection plan, and utilities coordination
Created page with "After securing a contractor, a pre-construction meeting between the project manager, project engineer, and contractor will facilitate an efficient job site and reduce the potential for miscommunication. These meetings should cover: • LID design detials and construction notes • material specifications, inspections, and chain-of-custody • acess routes and storage areas • protection of LID practices: phasing, ESC, and perimeter fencing • equipment requirements an..."
Construction: tendering and contract
no edit summary
m+39
Construction: tendering and contract
Tendering and contract
m−117
Construction: tendering and contract
no edit summary
m−155
Bioretention: Construction
Pre-Construction (KM)
m−39
Design verification and site walk-through
Design verification and site walk-through
m−65
LID construction notes
Created page with "====LID construction notes==== LID design drawings need detailed construction notes within the design drawings. These notes should include details relevant to: *sequencing and staging areas *material specifications *testing requirements *installation procedures *elevations and invert details for inlet, outlet, and overflow features *grading details for conveyance features *erosion and sediment control requirements *inspection and maintenance responsibilities during..."
6 July 2022
Bioretention: Construction
Pre-Construction (KM)
m+26
Bioretention: Construction
Pre-Construction (KM)
m+50
Construction: tendering and contract
Created page with "====Tendering and contract==== Ensure there is alignment between contract and tendered drawings, including their details, notes, ESC requirements, material specifications, and testing requirements. Given that most standard contract templates do not include this wording, considerations for LID can be placed under special provisions within the contract. A clear tender attracts experienced contractors to the project. A detailed bid form that accurately reflects the entir..."
File:Y-junction design detail.png
no edit summary
File:T-junction photo.jpg
no edit summary
Bioretention: Construction
Pre-Construction (KM)
m−2,293
Design verification and site walk-through
Created page with "====Design verification and site walk-through==== In preparation for finalizing the designs the project manager (PM) should conduct a walk-through of the site to verify that the designs match site conditions. This site walk-through is a critical step in the transition from design to construction and aids future pre-bid or pre-construction meetings. The PM should think carefully about how a contractor will be able to build the LID practice, determine if the design drawin..."
5 July 2022
Bioretention: Construction
Pre-Construction (KM)
m+3
Bioretention: Construction
Pre-Construction (KM)
m+253
File:Stockpile in gutter.jpg
no edit summary
File:Scarification.JPG
no edit summary
File:ESC perpendicular grooves.jpg
no edit summary
29 June 2022
Bioretention: Construction
Pre-Construction (KM)
m+1,182
Bioretention: Construction
Pre-Construction (KM)
m+44
Bioretention: Construction
Excavation and Mass Grading (KM)
m+14
Bioretention: Construction
Pre-Construction (KM)
m+155
Bioretention: Construction
Pre-Construction (KM)
m+2
Bioretention: Construction
Pre-Construction (KM)
m+3
Bioretention: Construction
Pre-Construction (KM)
m+1,536
Bioretention: Construction
Pre-Construction (KM)
m+745
Bioretention: Construction
Pre-Construction (KM)
m+4
13 September 2019
Definition of Low Impact Development
no edit summary
m−584
Definition of Low Impact Development
no edit summary
m+386
3 April 2019
13 March 2019
1 March 2019
15 January 2019
Table of contents
no edit summary
m+12
Site assessment of industrial, commercial and multi-res
See also
m+14
Clogging
Pipes
m+76
Mulch
no edit summary
m+140
Bioretention: Parking lots
Winter maintenance
m−1
Wildlife
Geese
m−10
Permeable pavements: Maintenance
no edit summary
m+356
Permeable pavements: Maintenance
no edit summary
m+164
Structural practices summary
no edit summary
m+156