Created page with "Throughout the construction process, it is sometimes necessary to deviate from the intended design of LID features and adapt the design to on-site conditions. The completion of a post-construction as-built survey is a standard operating procedure for engineering projects that captures any changes made to the feature’s design during construction.<sb> Survey Steps: #Use the same datum as the pre-engineering survey #If a pre-engineering survey is not available, use a ref..."